Jump to content

Search the Community

Showing results for tags 'hibernia'.



More search options

  • Search By Tags

    Type tags separated by commas.
  • Search By Author

Content Type


Forums

  • vBCms Comments
  • Irish Railway Modeller
    • Irish Models
    • News
    • General Chat
    • Irish Model Layouts
    • Tips & Tricks
    • What's On?
    • Questions & Answers
    • Workbench
    • For Sale or Wanted
    • Site News & Help
    • Weblinks
  • Photo Galleries
    • Photos of Models
    • What's happening on the network?
    • Photos & Videos of the Prototype
  • Railway related Modelling
    • Bus models
    • Trucks, Vans and cars
    • Buildings and kits of buildings
    • Aviation & Maritime Modelling
  • Non Irish Railway Modelling
    • British Outline Modelling
    • US / Canadian Railway Modelling
    • Continental European Modelling
  • Shops, Manufacturers & Services
    • Shops
    • Manufacturers
    • Services
  • Letting Off Steam
    • Letting off Steam

Categories

  • Prototype Drawings
    • Locomotives
    • Freight
    • Multiple Units & Railcars
    • Coaches
  • RTR Models
    • Locomotives
    • Freight
    • Coaches
    • Multiple Units
    • Buses and Vehicles
    • Buildings
  • Resources

Calendars

  • Community Calendar
  • Irish Railway Modeller Calendar

Blogs

There are no results to display.

There are no results to display.


Find results in...

Find results that contain...


Date Created

  • Start

    End


Last Updated

  • Start

    End


Filter by number of...

Joined

  • Start

    End


Group


Biography


Location


Interests


Occupation

Found 1 result

  1. I have been hacking away on the Hibernia Loco build which featured way back in my 'murrayec projects' in the Workbench area, I have decided to carry on showing the build here. If you want some background info on the project here is a link;- So after building the test plastic-card chassis I made a few adjustments to the drawings and then sat on the project due to the workload back then. A couple of months ago I started back at it and set up drawings to mill the parts from .5mm & .25mm brass sheet to build a brass test chassis and other components which will be needed to test fit out and to use to make moulds for white metal castings. I have also set-up a brass tube boiler and machined up a firebox former from 30mm dia nylon bar, again when the fitting is done on the firebox the former will be used for moulding the final unit. The boiler will be worked out when the motor and gearbox are installed. That's the fire hole in the back, the lower section is the ash-pan and the side cut will hopefully allow the chassis by! Last week the milling started on the chassis parts, cylinder base & heads, valve gear, bellcranks, and the nameplates in the .5mm brass;- This chassis has inside and outside frames, with the slot & tab frame stretcher construction I reckon .5mm will be plenty strong? Bellcranks are half depth milled to give the cast iron look, and in the footplate stretcher one can see the .5mm dia chain drilled holes to be opened up into slots for construction- the chassis frame tabs will stick up through these. Again half milled nameplates- can't wait to see these painted and the brass text all shined up. Next will be .25mm brass splashers, footplates, smokebox, smokebox doors, and more chassis fittings......... Eoin
×
×
  • Create New...

Important Information

Terms of Use