Jump to content

Class 800 Gauge 1 Upgrades

Rate this topic


murrayec
 Share

Recommended Posts

Here is a new project for 2019, a Class 800 Gauge 1 built by Brendan Kelly, it's in the workshop for cylinder parts, valve gear, coupler rods, and bake system work.

130947948_800G1-01IMAG4379.jpg.1a06ea2a1dfe02b4b2058f0a5e51fc4f.jpg

308244700_800G1-02IMAG4380.jpg.12c6d8b3eab340cf653ae654b90e144a.jpg

1559811845_800G1-03IMAG4381.jpg.4efde4974da7b884986bd610b188b48b.jpg

1173115383_800G1-04IMAG4382.jpg.b9c1cc8167294678f661c7cdba139820.jpg

I couldn't resist posting up some photos- it's a beast

You'll have to wait until after Christmas to see more..........

Eoin

  • Like 4
  • WOW! 3
Link to comment
Share on other sites

42 minutes ago, Horsetan said:

Will you be doing anything to lift the firebox height a bit?

Hi Horsetan

I really only took on the cylinder parts, valve gear, coupler rods, and bake system- though the firebox is something I will discuss with the client and we will see if something needs to be done?

Eoin

Link to comment
Share on other sites

  • 1 year later...

So I eventually got going on this project, after a few contemplation evenings and pencil sketches I set up a drawing and worked out a plan of action. The chassis, cylinders & motion bracket would be tackled first as this will aid in finalising the drawings for the valve motion gear. After stripping down the chassis I decided the cylinders need to be fixed on but, I may need to remove them so a bolt on affair was decided. The motion brackets are soldered to the underside of the body running board! this is not great, I prefer to work on the valve gear on the chassis alone, rather than having the whole loco on the bench and making things unwieldy and difficult, so the plan is to remove them from the body and install then on the chassis. This will make it easier to take the body off in the future as only one rod has to be undone- the oil pump rod, the other way most of the motion gear has to be dissembled and would be a real pain just to access the motor! 

All asunder.

343079323_800G1-0820200224_154839.jpg.8574542b9dffccd78a90f09b8a45d3c5.jpg

The chassis is a bit bendy, the new motion bracket and its frame will help. Also the counter-sunk screws on the frame spacers are not counter-sunk- so that will be done.

1816438265_800G1-0520200224_154850.jpg.7a1ea17a2fa6fddb5ec76ea5d2467eb0.jpg

Valve cylinders need end plates and a few other things.

1539613888_800G1-0620200224_154922.jpg.f6d2a066ba5c022cfa28ff83a9ee1acf.jpg

The motion brackets as is.

1046447408_800G1-0720200224_154908.jpg.dd71a00bcd751bcf2c70013f6814b4e0.jpg

.5mm brass angle plates were made up to fix the cylinders to chassis with 8BA screws through those frame spacers behind each valve cylinder.

760641792_800G1-0920200224_211559.jpg.8ec1cdcd99246e3d552e368dd4aedeee.jpg

Cylinder chassis plates soldered on and the frame spacer screws counter-sunk.

1942829298_800G1-1020200225_130500.jpg.2d1a8a9916dd9bd7909aaacbc4eef849.jpg

Holes about to be drilled and counter-sunk in the cylinder bracket, these holes will be used to spot through to the chassis plate for drilling for the captive nut.

2063060960_800G1-1120200225_130443.jpg.3daf6d9e852470e1f3ed72cc52f5eb44.jpg

Captive nuts soldered on.

2020888984_800G1-1220200225_142328.jpg.f45de554868f5b9e2c562a43462a95f5.jpg

Done, plates need a bit of trimming later.

628418056_800G1-1320200225_143207.jpg.12306fde05f619f9280351d47bfc8fbd.jpg

Removing the motion plates, this is the jig set-up- as both hands are required for the soldering iron and pulling at the parts.

1655964691_800G1-1420200225_145115.jpg.096113d7713aab844c71b6772b741a88.jpg

Clamp fixed to bracket with wood insulators between so that the clamp doesn't take all the heat, holds the bracket together- as its three pieces soldered to the running board, and something insulated to pull on to save my fingers.

1224270725_800G1-1520200225_145130.jpg.2b89fc153d0f37daab5604e5d9646c51.jpg

Done, the 100 watt iron was used only touching the motion brackets and loads of flux, once one gets the temperature up they came away relatively easy!

1020877611_800G1-1620200225_153027.jpg.543d9f24354858cd39eb17aa8b2932b0.jpg

Brackets cleaned up and two brass bars cut to size for holding the brackets to the chassis.

902728350_800G1-1720200225_204203.jpg.3e73853b477c513de2533c9c29b569e1.jpg

Soldering up.

1838248981_800G1-1820200225_211354.jpg.a74c6ac90587aec0fae10620f1a75302.jpg

Test fitting the assembly and marking the chassis in prep for cutting the slots in the frames to house it.

385445516_800G1-1920200225_213458.jpg.b9eb4a1726aec29c310d69090292f8bd.jpg

Thats all for now.

Eoin

 

  • Like 3
  • WOW! 2
Link to comment
Share on other sites

  • 1 year later...

I started on the valve gear for the Gauge 1 800, getting ready to assemble the chassis frames and axles so need the coupler rods first, so into the metal scarp box to see what we have;-

Various bits of mild steel were found that would work, 8mm thick bit at bottom for the drive rods, 4.5mm above for the coupler rods, then 5mm for radius rods, and finally 2.5mm sheet for the other bits.

712140374_800G1-2020210221_163851.jpg.025494cab9decffb7c9e5c65a891c5ca.jpg

Cleaning up the 4.5mm bits for the coupler rods.

1398292255_800G1-2120210316_134602.jpg.40126eb98b051c7b8b678e07e18356c9.jpg

Blued up for marking up.

534108267_800G1-2220210316_135530.jpg.f1dd2dfabf1263d10dbb87e149bf56d4.jpg

And marked up, this is for initial guide to set-up a jig to hold the metal parts on the mill machine.

545956467_800G1-2320210316_161252.jpg.f23cc9718f4ce4723b3ef004a2db9efd.jpg

First operation done- removing the straight bits along the rods by chain drilling and then milling slots with a 6mm endmill.1118150165_800G1-2420210401_123956.jpg.c7561a772cb4e88b4f1d751cb26b1bb1.jpg

Next the curvy bits are done on the rotary table with a 6mm endmill.

78589859_800G1-2520210405_152247.jpg.a29508ff574153ad4bdeab0e4a0f3d9e.jpg

Curvy bits complete, just needing the remainder scrap to be cut off.

1623919525_800G1-2620210409_143440.jpg.0f6c3bce96ca0dfdbb646dff8c10b671.jpg

Here the rods have been mounted on the jig in the vice and recessed face side cut with an 8mm endmill and then the flutes cut with a 3.2mm woodruff mill to 1mm depth.

1306711226_800G1-2720210416_122720.jpg.48dc6d8325457a2e9e360719063c2eeb.jpg

And the completed coupler rods after the oil boxes have been cut back on the front face and 1.2mm dia holes drilled in top for the oil filler plugs.

1645644857_800G1-2820210419_170645.jpg.09e511cd8fb2fb04f14dda8fc122c6f1.jpg

The rods still need a rub down with grades of emery paper to remove the machine marks- but that will be done later.

Next up will be the turning of axle jigs from 6.35mm dia aluminium rod, for soldering in the axle bearings in the chassis frames, the coupler rods will be used for this to line it all up.....

Eoin.

 

  • Like 4
  • WOW! 3
Link to comment
Share on other sites

  • 2 months later...

Time to fit the coupling rods and set up the chassis so that final dimensions can be set for the drive rods and crossheads to be made.

First though, as mentioned above the chassis is a bit fat and the wheels lock on the axle bearings when bolted up! So a 1mm shaving was taken off the face of all the bearings.

1471934443_800G1-2920210703_120518.jpg.059fa101f3c5b914e108c83ae46b55c3.jpg

535804359_800G1-3020210703_120553.jpg.131b89dce6d00dd9b11c801b77e7bf89.jpg

Bearings faced and then a set of axle jigs was turned up from 1/8'' aluminium rod to set the bearing centres while soldering them into the frames.

1978624928_800G1-3120210703_160926.jpg.e95315c4cf04471a056484903d3e7873.jpg

Just about ready to solder them in and I noticed the back bearings were sitting a bit low which held the centre wheels about 1.2mm above track level!

976145225_800G1-3220210703_120614.jpg.f4a6d812db3e8f5dc9a916c2b208d179.jpg

So a slight adjustment of the frames bearing holes was done on the mill.

1331064302_800G1-3320210703_180025.jpg.076677e70a24b39ff8b46993b9bd6371.jpg

Adjustments done and the bearings jigged up with the coupling rods, which sat beautifully level for soldering.

195486471_800G1-3420210703_212058.jpg.066310079e9dc323f3753568238f0b16.jpg

Next was to set up the centre drive wheel crankpins for the coupling and drive rod thickness at around 15mm- this is longer than what is available! Slaters do extended crankpins which will work for the other wheel setups, but the 800 has huge lumps of metal here and I'm kinda sticking to scale! So some extra long crankpins need to be machined and to do this we need two tools- a chuck tool with an 8BA threaded hole and a tailstock tool to support the end of the crankpin 10BA shank which equates to a bar with a 1.65mm hole in it to be held in the tailstock chuck- on the left is the chuck tool and on the right the tailstock tool machined from 6mm MS bar stock.

708716390_800G1-3520210705_111128.jpg.f679e7293cf88f55f8a65448dc553889.jpg

Demo of the Slaters crankpin screwed into the chuck tool.

1699917819_800G1-3620210705_111243.jpg.2bf7d7e1169d9ce84c528787b1ff7c27.jpg

And now the 10BA shank in the tailstock tool.

246604756_800G1-3720210705_111208.jpg.0b9b26d07e8380492dc5df03ab31769d.jpg

The 6mm bar stock parts cut to length and ready to be machined, thats a Slaters long crankpin below the bits.

574843013_800G1-3820210706_175052.jpg.262d3f9425eb6fb8a12cbcdf70bed1ca.jpg

Eoin.

  • Like 6
  • WOW! 1
Link to comment
Share on other sites

Join the conversation

You can post now and register later. If you have an account, sign in now to post with your account.

Guest
Reply to this topic...

×   Pasted as rich text.   Paste as plain text instead

  Only 75 emoji are allowed.

×   Your link has been automatically embedded.   Display as a link instead

×   Your previous content has been restored.   Clear editor

×   You cannot paste images directly. Upload or insert images from URL.

 Share

×
×
  • Create New...

Important Information

Terms of Use