Jump to content

Darragh

Members
  • Posts

    9
  • Joined

  • Last visited

Posts posted by Darragh

  1. 17 hours ago, David Holman said:

     So, double track main line coming in from the left. Single track line entering from the right. Will platforms one and two be just up and down separate, or will you want them both signalled for each direction?

     Potential for a multiple doll gantry across the three tracks where you have written "long sidings", with arms controlling entry to the quay and platforms 1-3 in one direction, plus starters from the quay and all the platforms in the other. That's before adding shunt signals to the long sidings. Could be positively bristling, but a serious job to build, let alone make work.

     Something simpler with several, separate posts probably better.

     Another question - will they be hand operated, remotely controlled or just decorative? Either way looks an interesting project.

     

    Something with separate posts would definitely be more suited to me, i don't have access to any laser cutters or 3D printers so these will be handmade as I'm on a budget

    They will probably be hand operated, in the future i might try to get them remotely controlled, but Ill have to see what I can do.

    Thanks for the help, but could you send us a drawing or something like that to get a better understanding of it please

    Thanks again

  2. Would anybody have any scale plans of any station buildings, signal cabins, goods sheds etc.. That they would be willing to share?

    I am looking for preferably GNR plans, or either any MGWR building plans.

    I've taken an interest in the old MGWR station in Athlone and would be absolutely delighted if anyone could share some pictures or track plans

    Thanks

×
×
  • Create New...

Important Information

Terms of Use