Jump to content

WaYSidE

Members
  • Posts

    268
  • Joined

  • Last visited

Status Updates posted by WaYSidE

  1. Model-Eat-IRM-Sleep-Kids-Work-Eat-Kids-Model-Eat-IRM-Sleep

    dont ask, i have specific reasons for this strange method of building

    small Attic  , It just fits 2 x 9x5 boards and a short mid section with an extra few meter runs both sides in holes in walls into small side attics. 2 levels built, 3rd is planned

    Track = >100 metres peco 100 track all mostly laid, star shape bus, 2.5 and 1.5 twisted bus, block wiring, two rail isolated gaps, 7 metre bus runs including track, too many insulfrogs , 80% of layout is wired above board, due to low ceiling and it being kids layout, while I sorta understood 'power divisions' and the difference x circuit breakers and then track occupancy requirements, as most is manual, i'v left all that to the latter part of the build, which is where I am now at, i use sand to level tracks and underlay for ballest

    when i get the next section of track layed i will upload it to IRM

    imageproxy.php?img=&key=ac96cff20d889157imageproxy.php?img=&key=ac96cff20d889157imageproxy.php?img=&key=ac96cff20d889157

    0001-northwest.JPG

    0002-northeast-with-incline.JPG

    0003-south-two levelsJPG.jpg

    0004-west.JPG

    0001-sand-ballast-northwest.JPG

    0005-southwest.JPG

×
×
  • Create New...

Important Information

Terms of Use