  1. Hi Junctionmad,

    Your layout plan for Limerick Junction is excellent, would be a serious amount of work if you went down the 21mm route.

    I started Nenagh in OO with Peco 100 track and got to a near complete layout before taking the plunge into 21mm. EM is

    a good option, at least you can buy the track in 1 metre lengths, but either way I recommend you use a finescale track.

    Are you able to see the rest of my photo's in the Album section of this site? You should be able to copy and zoom in on the

    details of the C10. Slide chairs are used but cut in two and used cosmetically.

  2. Are you using all plastic chairs for the points or a mixture of rivet and chair?

     

    Dave Hi,

     

    I have attached a photo of the underside of a C10 21mm P4 point in the Album, this shows the area where rivets are used, the rest is

    just plastic chairs.

  3. I was wondering about doing copperclad with wide sleeper spacing in the fiddle yard. I think it could be a lot cheaper

     

    Hi Junctionmad,

    Copperclad with wide sleeper spacing works fine in the fiddle yard, However,Nenagh will only have two loops albeit 18ft long, and at this stage I

    find building the track easier than soldering up.

  4. How are you securing the chairs to the track, pins, glue etc.?

     

    The chairs are glued to the Ply Sleepers with Butanone and in area's around the switch blades and nose, brass

    rivets are soldered to the rail and cosmetic chairs applied.

  5. RedRich Hi,

    The re-gauge on the 071 is nearly identical to the 181, I used P4 Black Beetle NS 14mm wheel sets. These came on

    2mm axles. The axles where changed for 2mm bright steel rod filled down to allow a BB of 19.88mm. The plastic gears are removed from the

    original and pushed onto the new axles (off centre) and a drop of thread lock. I have not required spacers or any removal of plastic!

  6. Nenagh is a 4mm layout based on the original track plan of this north county Tipperary

    town. The main track work for the scenic side of the layout is nearing completion

    and I hope to have a reasonable flow of photo's of the next number of weeks. More

    photo's in the Album.

    P4 21mm sleeper stain.JPG

    P4 21mm LH.jpg

    P4 21mm sleeper staining.jpg

    P4 21mm before staining.jpg

    B-7 P4 21mm.jpg

×
×
  • Create New...

Important Information

Terms of Use