Jump to content

21mmp4

Members
  • Posts

    15
  • Joined

  • Last visited

Everything posted by 21mmp4

  1. 21mmp4

    21mmp4

  2. Stunning work, well done, truly inspirational.
  3. Track laying and Ballasting on board number 4.
  4. Hi Junctionmad, Your layout plan for Limerick Junction is excellent, would be a serious amount of work if you went down the 21mm route. I started Nenagh in OO with Peco 100 track and got to a near complete layout before taking the plunge into 21mm. EM is a good option, at least you can buy the track in 1 metre lengths, but either way I recommend you use a finescale track. Are you able to see the rest of my photo's in the Album section of this site? You should be able to copy and zoom in on the details of the C10. Slide chairs are used but cut in two and used cosmetically.
  5. David Hi, The Ballast is Woodland Scenics Gray B75 fine.
  6. A few more pic's of Nenagh's track
  7. Hi Junctionmad, Copperclad with wide sleeper spacing works fine in the fiddle yard, However,Nenagh will only have two loops albeit 18ft long, and at this stage I find building the track easier than soldering up.
  8. The chairs are glued to the Ply Sleepers with Butanone and in area's around the switch blades and nose, brass rivets are soldered to the rail and cosmetic chairs applied.
×
×
  • Create New...

Important Information

Terms of Use