Mayner Posted April 30, 2013 Posted April 30, 2013 Probably one of the furthest travelled layouts I started these modules in Dublin about 15 years ago, they became the centre piece of a larger layout before a move to New Zealand and incorporation into another layout. The boards sat on a shelf for 5 years in our new home before dusting off for these photos. If I ever get round to it the buildings could end up in a new L shaped layout in the home office. A freight from Washington arrives in town behind LV power as a pair of D&H U30Cs wait to take over for the run to Montreal. Inspired by the D&H & EL operation in Binghampton I cherry picked various features only to find the original was not as visually interesting. A pair of Atlas LV C628 "Snowbirds" Kato D&H SD45s & U30Cs in the background. D&H power on the service tracks Atlas C628s & U23Bs ER Models (Bachmann) RF16s Stages in evolution GE U25B keeps company with Baldwin Sharknose Quote
Recommended Posts
Join the conversation
You can post now and register later. If you have an account, sign in now to post with your account.