murrayec Posted November 14, 2018 Posted November 14, 2018 (edited) This GNR T2 tank loco visited the shop for some upgrades- breaks, pick-ups, and wheel weights. Body off and a bit of a survey being carried out. With drawings done the parts were cut out in .5mm brass- wheel weights, break hangers n bars. All cleaned up with the Tufnol break shoes ready to go on. Main pick-ups upgraded with .4mm NS wipers and break stuff being soldered on. Nice little set of cast brass break shoes soldered on the bogie truck. .4mm NS wiper pick-ups installed under the bogie truck. Almost there. Chassis up and running. Body back on and its off to the owner and paint shop. Eoin Edited November 14, 2018 by murrayec 5 Quote
merlinxlili Posted November 15, 2018 Posted November 15, 2018 Big improvement Eoin! Takes the bare look off it. 1 Quote
Recommended Posts
Join the conversation
You can post now and register later. If you have an account, sign in now to post with your account.