Jump to content

Retro Herbie

Members
  • Posts

    160
  • Joined

  • Last visited

  • Days Won

    1

Posts posted by Retro Herbie

  1. Was working on a railway build for a customer in Kingscourt today so took the chance to photograph the station this evening before heading for home.

     

    The station building work looks to be little different from eiretrains photos from a few years back. It appears some half hearted FAS scheme, looks like a brick hasn't been laid for many years. Anyone local know what the long term plan for the building is?

     

     

     

     

     

     

     

    IMG_4798[1].jpg

    IMG_4796[1].jpg

    IMG_4795[1].jpg

    IMG_4792[1].jpg

    IMG_4798[1].jpg

    IMG_4796[1].jpg

    IMG_4795[1].jpg

    IMG_4792[1].jpg

  2. Thanks Retro Herbie for answering my question,I like to try and support my local model shops but sometimes prices prevent me from doing so,no offence was meant by my question,thats all it was a simple question.:cool:

     

    No offence taken mate I saw it as a genuine question. Expect the delivery to arrive early afternoon Monday so will confirm price then. Cheers

  3. Very simple Northman, they arrived into Dublin on Friday and shipped straight away to us, they will arrive with us Monday along with paper work which means we can confirm price. The estimate has always been approx £99 (see recent Bachmann publications too) if it is lower then great, everyone who has pre ordered them is fully aware the price is a guide and will be finalised when they arrive on Monday.

  4. Wiring is so easy, four wires from the signal, red and black are to a 16v power supply for the lights and two yellow leads for the mechanism and light switching. It requires a minimal pulse to throw the switch so can be wired to either a stud and pin/control panel or to the switches on the bottom of a motor.

×
×
  • Create New...

Important Information

Terms of Use