  1. With the catenary due to be erected on my Greystones layout, the question of cleaning the rails arose. I found the solution [i hope] on Youtube. Basically by fixing a wooden block underneath a flat wagon that I found at the Bray Fair last Sunday. The block is easily demountable as the photo shows.

    It depends for its function on the two flat head plaster board nails, glued to the block and then inserted into the retaining holes in the wagon.

    Preliminary tests indicate more attention to the type of material for the block will be required, possible more weight on the wagon.

     

    TC MDF 01 WP_20170303_003.jpg

     

    TC MDF 02 WP_20170303_010.jpg

     

    TC MDF 03 WP_20170303_007.jpg

  2. Christmas is over, back into railway modelling on an intense scale but slow start. Dart in shop getting bogie adjustments and service being rendered, but these are just to show that we are still active.

     

    Greys-01-WP_20170203_006.jpg

     

     

    Greys-02 10Feb17 WP_20170204_001.jpg

     

    Greys-03 10Feb17 WP_20170205_004.jpg

    I take responsibility for the slightly perpendicularly challanged buffers in this shot.

     

    Greys-04 10Feb17 WP_20170204_006.jpg

     

    Greys-05 10Feb17 WP_20170205_006.jpg

  3. Oh. This is equally important work. The Master has so much on his plate while I lack the skills he possess in such bounty, that progress may be slow, but it is persistent. [And he is standing at my shoulder as I type, with the static grass unit in his hand!]

    By the by, Kirley, he claims to that he has done further work on those bogies! :trains:

  4. Buffers 1 WP_20160123_17_03_57_Smart.jpg

    General view showing the new buffers. These are made from parts created with our 3D printer.

     

    New Fence  2 Buffers WP_20160123_17_02_40_Smart.jpg

    As well as new orange buffers, the yard has been made more secure, by the addition of new fencing.

    WP_20160123_17_10_59_Smart.jpg

    Who threw that fuel barrel over the wall?

     

    Missing Barrell WP_20160123_17_11_35_Smart.jpg

    Work continuing on the southern fiddle yard. The left hand track will also serve as storage for the DART, held overnight in order to provide an early morning sevice to Dublin.

  5. WP_20151204_21_55_19_Pro.jpg

    We got our "Portaloos" today. Additional supplies of fuel also arrived.

     

    WP_20151204_21_56_25_Pro (2).jpg

    An off-shore wind whipped up small waves. Tesco made a delivery, too.

     

    WP_20151204_21_56_57_Pro (2).jpg

    Detail of sand and sea, perhaps threatening some coastal erosion?

     

     

    For those who might be interested in the movement sequence at the Greystones Model, it follows here-under. Effectively, the station has to serve as a passing loop for all traffic between Bray and Wicklow. Surprisingly, I have yet to complete the whole sequence without a hitch! At the moment no times are specified, but that will follow.

     

    Movement Sequence at Greystones Station.

     

    1. Down Dart arrives Down platform

    2. Up Wicklow Commuter arrives Up Platform

    3. Up Wicklow Commuter departs Bray

    4. Down Dart moves to Up Platform

    5. Down Commuter arrives Down Platform

    6. Up Dart Departs Bray

    7. Up Timber empty arrives Up Platform

    8. Down Commuter departs Wicklow

    9. Up Timber reverses empties into Timber Yard siding

    10. Up Timber divides empties between both yard sidings

    11. Down Dart arrives Up platform

    12. Up Dart departs Up platform

    13. Timber loco shunts loaded wagons together

    14. Down Commuter arrives Up Platform

    15. Down Commuter departs Wicklow

    16. Up Timber departs siding to Greystones Down Platform

    17. Timber loco detaches from train and uses Up loop to go around train.

    18. Down Timber loco attaches to train and departs Wicklow

    19. Down Dart arrives Up platform

    20. Up Dart departs Bray

  6. The major project this week was to paint the timber yard a concrete finish and to try some planting.

    We have a fully worked out scheme for trees and bushes to be implemented. At the moment I just wanted to judge the effect of trees.

     

    B141 heading up the ramp to the "Timber Yard".

    WP_20151120_14_13_23_Smart.jpg

     

    Commuter DMU heading Down from Greystones towards Wicklow

    WP_20151122_15_40_56_Smart.jpg

     

    2700 Class passing under bridge by some trees.

    WP_20151122_15_41_48_Smart.jpg

  7. The Master says that I should include some descriptive text. What follows is an imagined instruction to the Station Master at Greystones on the operation of the station.

     

    My interest arises because, uniquely, Greystones is the only electric service on a single track, where Greystones Station functions both as a passing loop on the line to Wexford and as the terminus of the Dart Commuter service. In effect the need to receive and dispatch Dart trains at relatively short intervals, while accommodating the other traffic through the station is what interests me. Because there is no passing loop between Greystones and Bray, all schedules are determined by the time a train takes to clear this single section. The same applies on the "Down" trains from Greystones, but here the scheduling is much easier, due to the low frequency of the services.

     

    Some remarks about the layout

    The narrowness of the baseboard and my desire to have a curved track through Greystones, meant that it would not be possible to accommodate the small yard in its prototype location between the Down platform wall and the sea. Similarly, the Dart storage siding points were a problem. I therefore decided to relocate the small yard off the Down line south of the station and to incorporate the Dart storage siding in the Down fiddle yard. An Up fiddle yard beyond the bridge at the north end of the station represents the line to Bray.

    I have assumed that the bridge over the Barrow remains in use for the timber service.

     

    Greystones Station Operations

    THE DART

    The Dart electric service takes general priority.

    UP Dart trains must be despatched exactly on time.

    DOWN Dart trains will normally arrive at the UP platform.

     

    COMMUTER SERVICE

    UP trains will depart from UP platform.

    DOWN trains will arrive at DOWN platform.

    Note: DART Down trains will arrive at DOWN platform only when it is necessary to leave the UP platform clear for UP Commuter trains. Once these are cleared, the DOWN Dart must be moved to the UP platform, ready for UP departure.

     

    ROSSLARE SERVICE

    This train will not normally stop at the station. Passengers should not be admitted to the train should it stop, as this traffic is adequately catered for by the Dart and Commuter Services. Stops shown in the Working Timetable are for traffic purposes only.

     

    TIMBER FREIGHT SERVICES

    The imagined timber service to Belview Port requires the use of Greystones as a passing loop to relocate the locomotive to the head of the train.

    UP Timber trains will us the main line, including the DOWN line, to shunt these trains into the timber yard. Given the short length of the sidings in the Yard, all timber trains must be divided in the yard. The locomotive will remain in the yard, ready to haul the DOWN train.

    DOWN Timber trains, when marshaled, will be pulled to the UP line at Greystones Station. The locomotive will then uncouple, using the DOWN line to loop around the wagons, attach to them and then lead the DOWN train to Belview.

     

    OTHER FREIGHT SERVICES

    Company remains anxious to develop its freight services, especially through Roslare. With this objective in mind, occasional Special liner services may be run through Greystones Station, where possible at off-peak hours. These will be advised in the Working Timetable.

     

    ENGINEERING & WORKS SERVICES

    Pertrains, i.e. Sandite, Engineering and Works trains are run as required. These will be advised in the Working Timetable.

     

    Steam and other Passenger Specials

    These require special timetabling, which is negotiated with the train operators.

    In the case of steam locos, it is desirable that provision be made to obtain additional water for the engine, should this become necessary. This is the responsibility of the operator.

     

    Attached at some photos of some new senics. I particularly like the little shed, with bicycle and oil barrels. These are typical of the Master's creative abilities.

     

    The tide came in!

    WP_20151113_15_13_07_Pro.jpg

     

    The worker's bicycle leaning against hut in timber yard.

    WP_20151113_12_23_28_Smart.jpg

     

    Passenger lift shafts with over-bridge, at high tide

    WP_20151113_15_08_12_Pro.jpg

     

    The spur to the Timber Yard, with main line to right. [The yard awaits a concrete surfaced).