  1. I made some changes to the track alignment at Glen More. The curved point at the east end of the station was the source of occasional derailments. It was replaced with a regular point and the problem has been solved. The point for the beet loading siding was also moved west to the end of the passenger platform. The changes can be seen in the video.

    I'm still trying to figure out the video editing tools so the passenger train is shown twice!

     

  2. I have been working on modifying an Athearn blue box SD9 underframe for a SSM Sulzer. One of the fuel tanks was removed to shorten the wheel base and the remaining tank and SSM fuel tank castings were ground down to fit. A friend of mine who is a tool and die maker made quick work of this although it could be done with a file. The frame was then glued back together with epoxy using thick plasticard to brace it along the sides. The gears were removed from one of the bogies but the metal wheels were retained for electrical contact. One of the Athearn flywheels was retained. It may be possible to keep the 12 wheel drive but not with a flywheel and possibly a shorter motor would have to be substituted. The Athern bogies pick up current on one side and send it up through the metal tabs on each bogie. One of these was bent to clear the flywheel. On the other side the current is transferred to the locomotive frame. The original motor mount allows it to pick up current through a copper contact on the underside which makes contact with the frame however in order to have room for the flywheel I altered the motor position and then used wire to make all electrical contacts with contacts on the bogies. The motor was mounted using silicon and some scrap plasticard, an idea I got from Model Railroader years ago. This holds the motor tight enough to operate but it can easily be removed if necessary. The mechanism runs well but typical of the Athearn blue box diesels is a little noisy. Because the flywheel is on the side of the unpowered bogie limiting traction, fishing lure weights were add on the power bogie side and in the locomotive shell. As can be seen from one of the photos the locomotive body sits slightly high on the mechanism but this can be easily fixed by removing o little material from the inside of the shell. I took a little experimenting to get everything working and unfortunately when it was all assembled it runs backwards! To fix this the bogies will have to be reversed and while I am at it the wiring will be tidied up.

    2013-07-26 12.00.29.jpg

    1374851716801.jpg

    2013-07-26 11.15.59.jpg

  3. 1374844722059.jpg

     

    Here are a few more photos from the operating session showing the Waterford Cork goods picking up beet at Glen More station and Keily's Cross before proceeding to Grange where it crosses the Cork Waterford passenger train. Keily's Cross was inspired by the photo of Belleville in "Rails Through the West" taken by David Carse. I have always been fascinated by these remote sidings which were scattered throughout the Irish rail system and came to life during the beet season. Since the siding can only be shunted by westbound trains, empty wagons have to be dropped off at Glen More and backhauled by the west bound train for loading. This adds an interesting wrinkle to operation. When enough Open wagons are built a beet special will be run from Cork to Glen More and return to handle the traffic.

     

    The layout is mostly operated by myself running trains in sequence but it is more fun with a second or even third operator. With three people available the goods trains have a two person crew, driver and guard/shunter. The third operator runs the passenger trains. Despite the lack of signals the layout takes on a life of its own when operated, the trains become "real" with a purpose instead a collection of models. The height of the layout and walk around design make the railway accessible and easy to operate.

    1374844442381.jpg

    keilys cross.jpg

    picking up beet at Keilys Cross siding.jpg

    Waterford Cork goods picks up beet at G M.jpg

  4. Not much work has been done one the layout in the last few months but it is being operated. A sequence timetable is used where we run two passenger and one goods train each way representing the trains through Grange and Glen More during daylight hours. The whole sequence takes a little over an hour to run. It is mid October and the beet season is just beginning, the crop being sent to the Mallow sugar factory. The following pictures show the progress of the Cork Waterford goods which is distributing empty beet wagons today. One load of beet is picked up at Grange and forwarded to Glen More where it will be picked up along with the other loads by the Waterford Cork train. Along the way it crosses the Waterford Cork railcar at Grange and is passed by the Cork Rosslare train at Glen More. The guy with the beard is my neighbor Bruce, who would prefer to be running B&O articulated steam locos hauling coal hoppers!

    Cork Rosslare pass leaves G M.jpg

    shunting GlenMore.jpg

    Cork Rosslare arraives at G M.jpg

    Cork Waterford goods shunts Glen More.jpg

    bruce with Cork Waterford goods..jpg

    meet at Grange.jpg

    shunting Grange.jpg

    cork waterford goods at Grange.jpg

  5. As an early 60's modeller, the corrugated opens would certainly appeal to me. I would also add the standard CIE covered goods van; known I think to railway men as H's. these were the most numerous wagons ever to run in Ireland and lasted until the early 70's.

    It would also be great to see the CIE cattle wagons (KN) in RTR.

     

    The good thing about modelling early 60's goods trains is that you basically only need four wagons types: covered vans, corrugated opens, cattle wagons and brake vans. The latter are available, in 30T format from Studio Scale Models and the GNR version from yourself. Throw in a few ex-GNR covered vans, a few wooded opens and the job is done ( and I'm happy).

     

    Glover

     

    Glover is right on the mark about the H vans. Any layout depecting the 1950's to the mid 1970's should have lots of them. I'm suprised that a kit has not been available.

    SSM provide 30 ton brake vans and wooden opens and ex GN 12 ton vans and sliding door vans can be adapted from Parkside Dundas kits, what we need are H vans, Bulleid opens and CIE cattle wagons to convincingly model the CIE loose coupled era from the 1960's to the mid 1970's. Add a 20 ton brake van and some older vans and you have the 1950's covered also.

    It would also be nice if any new wagons produced could be converted to 21mm guage without major surgery. Best of luck with the project Liesley.

  6. Actually, I see that it's the Metcalfe one ...

     

    Thats correct. Its a nice kit but I have mixed feelings about it. It was chosen to reflect the atmosphere of the Mallow Waterford line. The orignal intention was to use two kits to make a longer viaduct but the space available was too short. The stone colour is also wrong for the region and the arches are about half the lenght of those of the Kilmacthomas viaduct. I decided to use just one kit to represent a smaller bridge rather than on oviously (to me) too small version of a large viaduct.

    Progress on the layout has been slow in the last few weeks and I havn't posted anything since my digital camera died. The platforms at Grange are under almost finished and an Athearn SD9 underframe has been shortened to fit a SSM Sulzer. I will post some photos as soon as a camera becomes available.

  7. Hi Train Model!

     

    When I put my business hat on, I'm surprised that no one has come up with a 'simplified' version, that would represent a 22' Irish wagon for those of us on a budget, or who might enjoy an RTR model thats balances detail with price.

     

    I would love to see an economical 'simplifed' 20 foot underframe available. It would be a great starting point for scratch building so many Irish wagons.

  8. Recent progress on the layout involved painting the backscene behind the road overbridge at Grange station and building the goods store and loading bank. This is my first effort scratchbuilding a structure. The roof is not yet finished. The model is based on the store at Tallow Road on the Mallow Waterford line, the demensions estimated from photos found online. The model is built from foam core board covered with styren stone sheet. A similar model will be built for Glen More station. I plan to add windows to the ends as soon as I find sutable ones somewhere.