Jump to content

Very Positive Experience of Integrated Rail Infrastructure

Rate this topic


Rush and Lusk

Recommended Posts

While we read/hear about, and perhaps experience, various negative stories about the national rail transport system, there is much to be positive about, and I'd like to very briefly share my own immediate experience. Yesterday I took a DART from a Dublin suburban station to Connolly, walked straight on to the LUAS red Line, 15 minutes directly to Heuston, Main Line service to Westport - today I did the same journey in reverse. The experience was excellent, and very easily achievable with minimum planning. I fully accept that this experience is not available to all, but this is just to illustrate how an integrated service, across three different rail systems can work. Small footnote: we had to wait a while at Manulla Junction to facilitate a failed timber train (Locomotive 086 I think). 

  • Like 5
  • Agree 1
  • Thanks 1
Link to comment
Share on other sites

59 minutes ago, Rush and Lusk said:

While we read/hear about, and perhaps experience, various negative stories about the national rail transport system, there is much to be positive about, and I'd like to very briefly share my own immediate experience. Yesterday I took a DART from a Dublin suburban station to Connolly, walked straight on to the LUAS red Line, 15 minutes directly to Heuston, Main Line service to Westport - today I did the same journey in reverse. The experience was excellent, and very easily achievable with minimum planning. I fully accept that this experience is not available to all, but this is just to illustrate how an integrated service, across three different rail systems can work. Small footnote: we had to wait a while at Manulla Junction to facilitate a failed timber train (Locomotive 086 I think). 

Correct Rusk & Lusk-an assisting locomotive (076) was sent from Ballina to Claremorris to haul back the timber train and 086 to platform two in Claremorris,

The Ballina branch train was delayed departing by 14 mins until 076 cleared off the branch at Manulla jctn hence the wait at the jctn for the 13:10 service. 
Normal service was resumed from Claremorris. 

  • Like 4
  • Informative 1
Link to comment
Share on other sites

Join the conversation

You can post now and register later. If you have an account, sign in now to post with your account.

Guest
Reply to this topic...

×   Pasted as rich text.   Paste as plain text instead

  Only 75 emoji are allowed.

×   Your link has been automatically embedded.   Display as a link instead

×   Your previous content has been restored.   Clear editor

×   You cannot paste images directly. Upload or insert images from URL.

×
×
  • Create New...

Important Information

Terms of Use