Jump to content

Irish Rail

Members
  • Posts

    169
  • Joined

  • Last visited

  • Days Won

    1

Posts posted by Irish Rail

  1. 2mey2cw.jpg

     

    Some of the Port Services fleet.

     

    m80395.jpg

     

    Port Fire Service "Rescue 1" Appliance.

     

    24d58g1.jpg

     

    Harbour Police, Port Fire Service & Port Operations Officers & the Harbour Master on the fisheries quayside for suspected persons in the water.

     

    2dw5csh.jpg

     

    Port Operations take advantages of quiet time in the lanes conducting a training exercise. Anti Collison beacons all running while on tracks..

  2. Not much progress recently due to renovating the house being the priority :)

     

    My good Michael Hand has been slaving on this beautiful example of a DVT which will feature in Fingal County.

     

    With lights recently added and working it's a beautiful example of what's to come if the completed set with accompanying Mk4 carriages.

     

    n4giah.jpg

     

    Irish Rail DVT Mk 4 Headlights

     

    29dvfp2.jpg

     

    Rear Red Lights

     

    2m6og8i.jpg

     

    More lighted vehicles coming soon to from Shedring Railways in Scotland.. including new Port Shuttle Bus

  3. The whole area is starting to look busy,with plenty going on, without a train in sight,nice modelling

     

     

    Thank hunslet, trying to use the details to help bring the layout alive just like in real life ;) Great satisfaction trying to add the tiny details.

     

    Ballasting and platforms coming soon so there will be more loco action

  4. There was 3 of the murphy coal wagons on one of the facebook selling pages for a TENNER a few weeks ago, a very nice bargain if there ever was one :o .

    as for hoarding stock whats wrong with it, it creates demand which in turn may lead to more models been produced.

     

    I got them :D

  5. v3ddz7.jpg

     

    Entrance to the port starting shape up including a Harbour Police vehicle checkpoint. Painting, road markings and lightings still to be finished.

     

    vqi0ec.jpg

     

    rcppgj.jpg

     

    New Pedestrian entrance added to Port Fingal including a turnstyle and Harbour Police Post for checking Port staffs ID Cards..

  6. Irish Rail Operations Manager & Engineering Support Team on site today for the newest addition to the fleet a IE Windoff MPV.. Having been off loaded from a cargo ship overnight.

     

    2s8shs6.jpg

     

    20r0br5.jpg

    The ports cctv keeps a watchful "eye" on the awaiting train spotters awaiting her first run out.. :trains:

     

    rur6ki.jpg

     

    2rzat5e.jpg

     

    Operations 2 provides a wide load/specialist vehicle escort to ports mobile crane.

  7. The guard on the evening oil train brake van noticed fuel leaking whilst it was under shunt.. He notified the engine driver who returned to the siding and immediatly shut engines off. Irish Rail contacted the Port Control Centre and the ports emergency fuel plan was innacted... The new fleet arrivals were put straight into action.. Operations 2 or call sign Ops 2 monitored clean up of fuel and Harbour Police 'Hotel Papa 4' secured the scene with the Ports Fire Services Rescue 1 & Rescue 3 in attendance too.. Irish Rail also on site...

     

    v7ck5k.jpg

     

    331ix45.jpg

     

    2wg9ci9.jpg

     

    jt7yw9.jpg

     

    23igg02.jpg

     

    122new7.jpg

     

    fx88c1.jpg

  8. Thanks mate :) have to build the Harbour wall next and ive yet to decide what method to use to represent water.. which im still researching

     

    I've built a small collection of scale boats to fill the waterline with and would like to build a small promenade and possible a band stand.. then some half relief buildings pubs/hotels etc.. to add..

     

    I sourced a fitting building to become the passenger terminal building which is on the building list which will have usual bus stops and drop off zone parking like in any modern port.

  9. Delighted with the progress with my layout and this section Port Fingal..We Built and added the first pier of the port 2ft x 1ft and my first waterline for some of my boats to go on. The pier will house the Passenger Terminal Building for ferry and cruise ships.. Tacked & ballasted the track for my first ever train station!!   the docklands station which is a single track terminus for DMU traffic..

     

    344ednd.jpg

     

    A Arrow DMU passes an Commuter DMU on the Dublin - Belfast mainline.

     

    2aetu6b.jpg

     

    Buildings on the quayside include the Customs House, Harbour Police station & No.1 Harbour House office block.

     

    2qk426u.jpg

     

    On the far left the Harbour Police Security checkpoint which form part of the Ports main entrance.

     

    27yc2f4.jpg

     

    2v2vaiv.jpg

     

    The waterline of the harbour/marina.

     

    675rbt.jpg

     

    The footprint of the docklands station I still have work to do on the platform and ballasting etc..

×
×
  • Create New...

Important Information

Terms of Use