Jump to content

Rolling stock return to be completed

Rate this topic


Recommended Posts

Posted

Better check your layouts, spares box and all those green boxes on the shelf and in the cabinet….

Incorrect or late returns will be punished by a stern letter from Kingsbridge, and ye wouldn’t want that, would ye?

4C3640B8-E769-4FF6-94D8-95BA0FB82C9D.jpeg

  • Like 1
Posted
1 hour ago, jhb171achill said:

Better check your layouts, spares box and all those green boxes on the shelf and in the cabinet….

Incorrect or late returns will be punished by a stern letter from Kingsbridge, and ye wouldn’t want that, would ye?

4C3640B8-E769-4FF6-94D8-95BA0FB82C9D.jpeg

Interesting mainly West Cork, South Eastern and Midland wagons with a small number of GSWR/GSR.

I wonder had they been carded/withdrawn/broken up and Carriage & Wagon Department not informed the Traffic Department or the Control Office.

Railways are famous for siloed thinking I had some interesting interactions as a HSA inspector with IE about 20 years ago and quickly I found out that Signal and Electrical  did always not keep Permanent Way in the loop about things they were doing on or very close to the line.

  • Like 1

Join the conversation

You can post now and register later. If you have an account, sign in now to post with your account.

Guest
Reply to this topic...

×   Pasted as rich text.   Paste as plain text instead

  Only 75 emoji are allowed.

×   Your link has been automatically embedded.   Display as a link instead

×   Your previous content has been restored.   Clear editor

×   You cannot paste images directly. Upload or insert images from URL.

×
×
  • Create New...

Important Information

Terms of Use