WaYSidE Posted April 29, 2020 Posted April 29, 2020 168687 - 7498 - Infrastructure study for BEMU operation Publication date: 27-04-2020 Response deadline: 22-05-2020 12:00 Irish time Procedure: Iarnród Éireann - Non OJEU Negotiated Procedure (Electronic) Description: Iarnród Éireann - Irish Rail has a requirement for a consultancy service to provide all studies necessary to, and produce the cost estimate for 1. Life cycle costs of BEMU vehicles 2. Life cycle cost associated to BEMU operating infrastructure – battery charging system, sidings, turnouts, maintenance, etc Buyer: Iarnród Eireann-Irish Rail i suppose i can rip up two winters work of wiring my layout and get the IRM battery version of the new BEMU. no wires i did say in a post some years ago, we should all change to batter op' model rail ditch the wires and all Quote
DiveController Posted July 8, 2020 Posted July 8, 2020 Some of the guys in the US run some on battery under RC control in S gauge I think, they turn up at exhibitions now and again and it cuts out a lot of problems with multi-track wyes and reverse loops Quote
Recommended Posts
Join the conversation
You can post now and register later. If you have an account, sign in now to post with your account.