Jump to content

Jack_Dunboyne

Members
  • Posts

    205
  • Joined

  • Last visited

  • Days Won

    4

Everything posted by Jack_Dunboyne

  1. Ready mixed filler mixed with wood glue as a top layer. Some sanding tomorrow and It's ready to seed some grass.
  2. Terrain ready. Kitchen towel soaked with white glue. Needs to dry overnight and another layer tomorrow.
  3. That's completely different stuff. Styro in, tomorrow I will be carving the terrain.
  4. Walter, be quiet or they will kick us out .....
  5. I'm trying to move FREMO to Ireland for the last 6-7 years, but with no results. There was always some "BUT". I hope thanks to that layout, that I want to present on the shows next year that will finally change. The biggest challenge I found is to convince other to accept this norm as it is, without any buts, shortcuts, etc. I'm able to supply the boards and ends now and I hope we will be able to meet one day and play some proper trains
  6. The biggest Fremo layout I have ever seen was almost a mile long. The beauty of that is, that you are not space limited while working on the modules itself. I talk to the lad, and the whole range og the modules will be available in Ireland and UK within 2-3 weeks. @murphaph you can use FREMO for OO as well.
  7. I have a lad in Poland, ho is doing it for me. If you need anything, send me a PM.
  8. Let's the fun begin First two modules assembled:
  9. When the ordered modules are late....
  10. All stuff reserved , more to come tomorrow
  11. PM sent
  12. Bachmann 30-160 Rural Commuter - sold
  13. BR Class 08 - sold
  14. 3 bridges (2 with boxes) + curved platform - SOLD
  15. - set 4 OO - resin accessories 5 Euro RESERVED
  16. Set of 2 resin buildings - SOLD
  17. What is the purpose of marked cross? I think you could use it better in different part of the layout.
  18. As the continental model topic is dead, I will start new topic in here. As I got the permission from home manager (my wife) to build a proper man cave - I did order a nice 5x3 m Cabin log. It should be ready within 4 weeks. It will be turned into proper train cave. I'm coming back to my idea of the proper FREMO modular layout. I will have first boxes ready till the end of this week and I will start posting proper photo story. Initial layout is approx. 12 m long. DCC operated with DR5000-ADJ on board. Fremo E96 and 2E96 fronts will be used. Polish loco and scenery only. Stay tuned for the photos
  19. Set 4 OO - 3 buildings + signal Gantry - SOLD
  20. Like new - with boxes - set 3 OO - SOLD
  21. - set 1 OO - resin accessories 7 Euro RESERVED - set 2 OO - 2 tunel portals - 5 Euro RESERVED
  22. Hello everybody. As I'm switching to H0 scale completely, I'm getting rid of my OO stuff. I will post in the next few days, the items for sale. I will try to put them in the sets worth 10-20 Euro. I will post some locos later today, and the first sets of items.
  23. the shop is not operating since 2017
×
×
  • Create New...

Important Information

Terms of Use