  1. Hey all, time for an update and the various projects going on at the moment :) I like being able to move from one to the next and keep different types of projects on the go, keeps it interesting :)

    Concrete Industrial Yard

    First up is the open space between the depot and the scenery. I don't want to make this area too busy with buildings and quite like the idea of having a sort of open yard / waste ground area to tie in the depot with the scenic backdrop, which has a carp park / open area. So I got out the DAS clay and started laying it down relatively smoothly but with some relief / some texture and broken up / ragged areas near the ballast. I think this will work well when I add ballast / ground cover / grass and blend in the rough concrete

    concrete1.thumb.jpeg.0a3fc8b735e35f468451131920eeff71.jpeg

     

    concrete2.thumb.jpeg.9da459851cbd9d60abe979ebaab84348.jpeg

     

    This is a good shot to show the roughness, hopefully this will mimic old, worn down concrete like you'd find in an infrequently-used part of an industrial park.

    concrete3.thumb.jpeg.35742c27b28e32cee1db628853ee9894.jpeg

     

    Cutting some cracks and potholes into the hardened DAS clay.

    concrete4.thumb.jpeg.84983d5505fc032cb9ddd9e448ad9f03.jpeg

     

    The long grooves are for adding walls later on after painting.

    concrete5.thumb.jpeg.e579f43eff429b8419ddba4900da4968.jpeg

     

    Spray painted with about 4 or 5 coats of my custom concrete mix :) If you're interested it's Humbrol Matt 27:28:121:34 in the approx ratio 2:6:6:4 and thinned 1:1

    concrete6.thumb.jpeg.7be91b67915a70c6c4ec26976d90d587.jpeg

     

    Next job to do is to use the dabbing technique to add dark and then light patches to this base, then some black wash to blend it together.

     

    Figure Painting

    Bought a bunch of ModelU figures for the yard and have started painting them with acrylics washes. I saw a very effective technique for this on Bunter's Yard: https://www.youtube.com/watch?v=biJWFlohnXw&list=LL&index=16. You spray the figures matt back all over, then spray matt white only from above mimicking where light comes from. This forms a base so that when you start adding thin colour washes, the dark and light will bring up the shadows through the colour.

    Here's the result of that first step:

    figures1.thumb.jpeg.0d27f4718c752e9536c07dfc2be58db7.jpeg

     

    Then using various thin washes in shades of pink / brown for the flesh...

    figures2.thumb.jpeg.90afeb7655039f41602d7e3a42f3b2e3.jpeg

     

    And various thin washes of colour for the clothing, here's an example of a finished figure, very happy with this result :)

    figures0.thumb.jpeg.fb4ac3260ed70bf6c8e28bc95ece2c8e.jpeg

     

    Hills & Scenery

    Next up is hills and scenery, I haven't done a whole lot on this yet as I need the tunnel in place before I can sculpt, shape and fix the scenery in place. But the plan was done using paper and then the rough shape of the hills (using foam insulation) has been cut out and glued. More to come on this.

    hills1.thumb.jpeg.2ac7fe2936efa94c342e62d3058630fe.jpeg

    hills2.thumb.jpeg.cf8c179ba82e8aacf55d5ce4b5368882.jpeg

     

    The Tunnel

    Now this is an awkward beast! The tunnel will transition the main depot area with the hills and scenery section. Due to the limited space though, the track is right at the edge of the base board and the angles are very strange. The back section of the tunnel will also drop down to a support underneath the baseboard frame, so it can be set about 20mm back from the track and give the loco enough clearance. 

    tunnel1.thumb.jpeg.75053d3cc176ca80be4481becd4c84bb.jpeg

     

    Starting to cut out the basic shapes and glue them together. I'm using combinations of 3, 6 and 9mm MDF.

    tunnel2.thumb.jpeg.bb91efd08d939d1e58c2224c9503a033.jpeg

    tunnel3.thumb.jpeg.f4cbe9bd93b131ed28001bcc0c21d06a.jpeg

     

    Basic frame is complete, here you can start to see the weird angles needed.

    tunnel4.thumb.jpeg.ab154024a62472c4936a6d940b23d992.jpeg

     

    With the frame complete, I've started adding the brickwork. This is embossed card with punched out texture which works really well. Got it on Etsy from Greece: https://www.etsy.com/ie/listing/1063916581/new-16-sheets-wall-00-176-scale-wall?ref=yr_purchases One thing is that we don't have a lot of red brick in Ireland, but the card takes weathering powder very well, so I'll be weathering this to match the grey / black colour we usually have in our bridge tunnels.

    tunnel5.thumb.jpeg.e4c8611e7b473c02bc49cdd0909b731a.jpeg

    tunnel6.thumb.jpeg.37bbebdd30fc302bba1e5fa318580672.jpeg

    tunnel7.thumb.jpeg.ca04372d1d9da71e3930f9528851d394.jpeg

     

    Foreground Wall

    While doing the tunnel I also started adding a wall to the foreground. I saw this done on a layout somewhere and it worked really well when taking photos - instead of seeing the layout run to a baseboard edge, you were almost peeking over the wall to the railway beyond. Adding some bushes and shrubs in front of the wall should add to the illusion I think :) I'll be adding capstones soon as well.

    wall1.thumb.jpeg.da5d10bd106396781d887287dbed409e.jpeg

    wall2.thumb.jpeg.98525046034d3c7de933260873972f1d.jpeg

     

    More updates coming soon!

     

    • Like 9
  2. Hey all, have been working all summer in the cabin (as usual with modelling, when I get the time ;) ) and have the frame construction complete for the layout :) Very happy with the result, it's solid and sturdy and given I'm by no means a carpenter it turned out surprisingly straight and true. See what you think below...

    Starting off with materials and technique, I'm using 2x2 pine for the frame, with 9mm MDF for the baseboard (this will be sealed). The baseboards will be open to make it easier to have multi level scenery and not lock everything into a flat surface.

    To keep things level, I found very effective, cheap, small feet adjusters in Screwfix. These were really good and easy to install (drill an 8mm hole about 10cm into the leg and hammer in the bracket), most feet adjusters in the hardware shops are for kitchen cabinets etc. and were way too big. Here's the link if you're looking for them for your own layout: https://www.screwfix.ie/p/suki-levelling-foot-m8-x-60mm-2-pack/838gx

    IMG_9390.thumb.jpeg.e2ad0f8c0cbb3aafc81d7e200f892944.jpegIMG_9394.thumb.jpeg.bb7971bed044436c3454110d7d831a29.jpeg

     

    To strengthen the joints and keep them square, my brother (a cabinet maker by trade) suggested using 45 degree blocks, this worked very effectively (should note at this point that everything was cut by hand for accuracy, no small feat!).
    IMG_9427.thumb.jpeg.a91d19ed366999fa89acdf4a60093442.jpeg

     

    First piece screwed in in early June...

    IMG_9392.thumb.jpeg.db9977ad7b0876d9f141ec5c763dc5b2.jpeg

     

    Starting the back wall; the lower level will be a fiddle yard and the mid level above it will be the terminus station.

    IMG_9428.thumb.jpeg.c558b2d11b4f44c468506d3242974bfd.jpeg

     

    Back wall complete and I have my technique working well, now it's just a case of rinse and repeat for most of it. The diagonal space on the right will let me in behind the layout, since this is where the diagonal cross section will come in, I'll need this spot to be able to reach parts of the layout - as long as I don't put on too much weight over the years I should be fine :)

    IMG_9438.thumb.jpeg.4d9466284e595e6cd79090d399b24095.jpeg

     

    Continuing with the left side wall, this will be the main scenic area, likely with some sort of viaduct over a valley, which I'll cut out at some stage. Another diagonal access area at this point as well.

    IMG_9466.thumb.jpeg.ebfc8a212b6067bb71220c7b9a1919d2.jpeg

     

    Coming forward along the windows, this will show the three levels and coming towards the camera will be the approach to the station throat.

    IMG_9467.thumb.jpeg.4e64a0ca025bdedb71aea96761dbe1af.jpeg

     

    About 60% there, now for the tricky bits, the access to the cabin door and the cross section in the middle. The right side in this photo will be the depot area and station throat.

    IMG_9475.thumb.jpeg.e058b4c259edaba885465f4c4aa787b7.jpeg

     

    This...tested my limited skills :) I opted for a swing out area rather than sliding or lift up. There will be multiple levels and scenery so a lift up would be awkward, squashing scenery on one side. And sliding might result in accidents. The swing gate has enough clearance to let me in and out and will not hit the cross sections when it swings in (after careful measurement!). If you look at the doors, it's a pain in the arse but the dimensions and swinging space required that I have to use the right door to get in and out, so both need to be open. It's a small price to pay. I did look at swapping out the door handle and lock system...but then quickly chose not to do that :)

    IMG_9524.thumb.jpeg.8c2ba7e511114d2959fb0e0dea4eb137.jpeg

     

    The catches locking it in place and are nice and accurate so hopefully this will work out when it comes to laying track. If not, I'll figure something else out.

    IMG_9525.thumb.jpeg.8cf097844f1250b3d9e30d6cf95a30e2.jpeg

     

    The final hurdle, lining up the diagonal cross section. This long straight area will serve as a secondary station and also a way to reverse the locos direction across the layout without having to manually intervene. This is important to me as I have always wanted a train to be able to leave the terminus and then drive back in to it as in real life, without me having to lift and turn it around.

    IMG_9628.thumb.jpeg.f45ceab136d61f852b366cf701654125.jpeg

    IMG_9775.thumb.jpeg.52d1f412d5db2a89c7e70efd3ba0b544.jpeg

     

    Here you can now see why the diagonal access space at the back is important. Also, as I had hoped, the short cross braces / buttresses not only will allow more layout, but also made the diagonal section very strong and locked in place. There's no sway at all.

    IMG_9799.thumb.jpeg.3ffc73152e42a220980535aef283c751.jpeg

     

    And here we are, the full frame is complete in October, almost 4 months to the day. As I have a second layout and office space in the main house, I opted to maximise the space for the railway rather than working area in the cabin. I also need to crawl under to get from space to space but sure that'll keep me nimble ;)

    IMG_9793.thumb.jpeg.f0ddd27657e9b81a3048499f3da0edf2.jpeg

     

    Hope you enjoyed the update, next up is to figure out baseboards and supports for multiple levels :)

    • Like 9
    • WOW! 7
  3. Thanks Leslie, rule #1 applies to a lot of these points :)
     
    1. Hhmmm. As you're modelling 1980-ish, why the TURNTABLE? I've always, always wanted a turntable but never had the space, and then modelling the 80s I was wondering how to include it. However I then found this video from 1992 of a 121 being turned around https://youtu.be/IPtPbkXB4No and so I'm going to model an old, rarely used turntable which still functions :)
    2. Final wind-up. A single track from the terminus to the Main Line? Yep, I originally had two but wanted to reduce the amount of track and double lines running everywhere, as well as diamond crossings as you mentioned. Plus it gives me an excuse to add some operator interest with a control light and leaving a train waiting for another to pass. Maybe not 100% how it would be in real life, but again, rule #1 
    3. I presume that you're 30/40 Yep, I'm 42 so plenty of time and flexibility to get under the boards (for now). And if it becomes a problem, it's an excuse to rebuild (bigger) ;)

    Thanks for your comments!

     

    • Like 4
  4. Finally, finally completed the layout plan. Gonna call this Riverbank Railway, I've been going over the plan in my head for months, trying to get the balance of track versus scenery versus what I want :) Have been working on it / revising / tweaking for months - orange is upper level () for mainline running, purple is mid level with the terminus station and green is the lower level with branch station, fiddle yard and loops for switching train direction - I've always wanted the train to be able to leave the terminus and then arrive back in without reversing or manually turning it around. It'll take some electrical work on the loops but that has become easier with modern digital and shouldn't be too hard. 

    There's a depot area off the main line out of the terminus, similar to how Inchicore is down the line from Heuston, and plenty of space and natural curves for full length 8 carriage trains to stretch out - the platforms are also long enough to take 8 carriages and a loco and the sharpest curves are only 3rd radius so should be no problem :)

    Lots of track and wood to buy now to get started...

     

    Charobyn_v1.1.thumb.jpg.d51b68183eeeef6464013c33a5f9bc55.jpg

    • Like 6
  5. On 5/3/2023 at 10:24 PM, Patrick Davey said:

    Apologies @Adrian I didn't mean to whip up all those horse puns.  Wishing you every success with the build - once you get started things will surely gallop along......

     

    No worries Patrick, very funny everyone :)

     

    On 5/3/2023 at 10:44 PM, DJ Dangerous said:

    Enough horseplay, you bunch of cowboys.

    Savage space, @Adrian!

    Thank you, gonna take a while I think...

  6. Finally got electricity to the cabin, so that means Google Home Wi-Fi extender and electric heaters. Also got a Wiz Smart LED strip up last night, so now…1 busy year later…am finally in a position to start proper modelling work :)

    F59204CC-8CA3-4EFD-A642-36888BFEEDED.thumb.jpeg.67a531eb67b578e3e84a60b5267e638b.jpeg

    • Like 10
    • WOW! 4
  7. Quick update - nothing has happened on the Railway cabin since last March! Basically I need to run electricity out to the cabin in order to have lighting and heat. And for that I need my brother-in-law's help (he's an electrician). However we both have small kids, both were super busy during the year and had other priorities and it got put on the long finger. Also, since the cabin was bought, the stables then took priority (!) and they got built over the summer. 

    Also had planned to do it at Christmas, but then we all got COVID in our house so that put the cibosh on that. Hopefully we will get it done on the upcoming bank holiday Monday and then we're off :)

    In the meantime I can share a few pics from when I was planning out the layout. The main feature will be a full length (loco plus 8 carriages - approx 2.8 metres) ) terminus station, something I've always wanted. As you can see below, technically it would fit at the end of the cabin (4 metres) but it would be a tight fit with station buildings / scenery etc and might look a little staged when the train is pulling out of the station and immediately into a curve (although I'm sure there's an example in real life - there usually is!). Nevertheless, looking at the next photo where the train is along the long edge of the cabin (6 metres) I think it looks much better and am gonna go with that. It gives the train room to straighten up before entering the station and a lot more space for pointwork and busy lineside detaling etc. which is something I love doing :)

    IMG_4312.thumb.jpg.f140c063cd6abd2f5e978586ebc46f19.jpgIMG_4314.thumb.jpg.13a69f5cdef2cf3b211955f8f4d0c84f.jpg

     

     

     

     

     

     

     

     

     

     

     

     

    And with plans for an 80 cm wide baseboard, with two hidden tracks at the wall for the express line loops, it should give enough space for a 6 platform terminus station, which is plenty :)

    IMG_4319.thumb.jpg.d2623d7875dbfac6b94b4a9d22a461a4.jpg

     

     

     

     

     

     

     

     

     

     

     

     

     

     

     

     

     

     

     

     

     

     

     

    And sure while we're at it, here's the new stables that did all the delaying of the railway cabin...but far be it from me to complain ;)

    IMG_4240.thumb.JPG.ce17b061e6ea2ec28e056540226eed1d.JPG

     

     

    • Like 9
  8. They're out there alright - my best advice is to keep an eye on ebay (maybe setup an automated alert for the search) and be prepared to pay fast and pay high. You should be budgeting about £350 sterling cos that's what they're going for these days. 

    Since this post I have been able to seriously expand my fleet using ebay and a layout update for Riverbank is well over due - watch this space over the next few days :)

×
×