Railway Lyons Posted yesterday at 19:49 Posted yesterday at 19:49 Bit of a tidy up at home in junk/decorations attic, found a box hidden away and un-labeled. It was heavy, but after some wrangling, it was liberated to find......all 130 issues, unopened of a Hachette Partworks - Build Your Mallard. A few hours this evening and we have 8 issues built. I'm soldering instead of gluing for a longer lasting build. Going to take a while, but already have an A1 Scotman, and an A4 Bittern without valances built, so be nice addition when it done. 5 2
Colonel Posted 15 hours ago Posted 15 hours ago Makes you wonder how many more of these part-works are stashed away like this, or indeed how many never collected the full set. It will be nice to learn about this one's progress though. 1
Railway Lyons Posted 3 hours ago Author Posted 3 hours ago Another hour this evening, but it tried my patience. More internal spacers/bracing and 2nd outer frame on RHS chassis frame, with some of the gubbins and bushes. Solder one frame bracket on, and another falls off. Got there in the end. LHS to repeat this on, maybe tomorrow. I can see why instructions say superglue for novice builders, and as @Colonel said, wonder how many never started or gave up.
Horsetan Posted 2 hours ago Posted 2 hours ago 11 minutes ago, Railway Lyons said: ....I can see why instructions say superglue for novice builders, .... Unfortunately that works both ways. A couple of years ago, I picked up a part-built Backwoods Miniatures kit for the Industrial Garratt. Whoever had built it (to OO) had used Araldite throughout - body, both chassis, cylinders, the lot. It took at least a month to carve and scrape the dried Araldite off and separate all the parts for proper solder re-assembly; the stuff was everywhere and had set very hard. A proper nightmare. Dunno why people do it that way. 1
Railway Lyons Posted 2 hours ago Author Posted 2 hours ago 26 minutes ago, Horsetan said: Unfortunately that works both ways. A couple of years ago, I picked up a part-built Backwoods Miniatures kit for the Industrial Garratt. Whoever had built it (to OO) had used Araldite throughout - body, both chassis, cylinders, the lot. It took at least a month to carve and scrape the dried Araldite off and separate all the parts for proper solder re-assembly; the stuff was everywhere and had set very hard. A proper nightmare. Dunno why people do it that way. For display only, gluing might be fine, but to run, solder is the only way I would trust. Only because i have experience building in brass for both OO and O gauges, im ready for the trails and the lomg haul. Perhaps the Garratt you got was never intended to run, but be a nice display/talking point instead. 1
murrayec Posted 9 minutes ago Posted 9 minutes ago I see burning on the chassis frames where soldered! Is the brass coated with something? I heard that the brass can be coated for gluing if this is a magazine Kit..... Could be wrong Eoin
Horsetan Posted 6 minutes ago Posted 6 minutes ago 2 hours ago, Railway Lyons said: ....Perhaps the Garratt you got was never intended to run, but be a nice display/talking point instead. Not anymore it's not!
Recommended Posts
Create an account or sign in to comment
You need to be a member in order to leave a comment
Create an account
Sign up for a new account in our community. It's easy!
Register a new accountSign in
Already have an account? Sign in here.
Sign In Now