Jump to content

hurricanemk1c

Members
  • Posts

    628
  • Joined

  • Last visited

  • Days Won

    1

Posts posted by hurricanemk1c

  1. There is talk of various bogs becoming natural parks with possible rail attractions. There may be other plans as well....

    Stradbally definately has an eye on a few items coming up, and to my knowledge is the only place where a reasonable accurate (bar length and loco livery) turf train can be found

    Stradbally, 17/8/19

     

    • Like 2
  2. Part of it may be a large backlog of requests or more general products that he's trying to space out. Understandable given he's a one-man band and looks to produce some incredible stuff

    • Like 1
    • Angry 1
  3. See, a bit of research makes the automatic "this is new it must be bad it's the end of the world" automatic response a bit stupid. As for concerns over one centre looking after most of the country, it already happens in thr existing CTC!

    • Like 2
  4. On 6/6/2020 at 11:05 PM, Railer said:

    If IRM do them they will be better than the Bachmann versions as they basically the UK versions resprayed. The IE ones have a different bogie and buffer type, IRM might even get a lighting pack in them too. 

    What do you think the real ones are - they are JJA's with buffers at each end and 5ft 3in bogies. Nothing overly special about them!

     

    Great work on the layout and stock warb!

  5. To clarify a few matters:

    • Most of the existing CTC equipment dates from DART introduction in 1984. To do auto-routing takes about two days to prepare on ancient computer equipment (relatively speaking) that struggles with the current service level without an more services. It's a dull, compact, crowded place in Connolly.
    • There will be a back up in addition to the existing Emergency Control Panels around the country
    • The new building is being built on what was Guinness Sidings 1, 2 and 3 (from memory). 4, 5 and 6 are remaining for stabling as required
    • This is also being combined with the Garda Control Centre, so if anything it's saving money by combining what would be two buildings into one
    • TMS is industry standard now, this will allow multiple different systems (that have to be separate to perform different functions etc) to work together, such as the Hacon Train Planning System to auto upload routing information to the TMS, that can then adapt said routing on a day-to-day basis to cope with delays etc
    • I'm not even going to bother arguing about fleet issues, since it's been discussed time and time again with little understanding despite attempts from multiple angles
    • Like 3
    • Informative 1
×
×
  • Create New...

Important Information

Terms of Use