Jump to content

Junctionmad

Members
  • Posts

    1,136
  • Joined

  • Last visited

  • Days Won

    1

Everything posted by Junctionmad

  1. I second that. That's the only way to condition dirty track , the meths/IPA is only good once the track is basically bright clean
  2. Hmmm I have seen in the 80 s both types on the same post , one a brighter standard signal red the other a faded orange. You think the orange was by design. I often wondered did it denote a signal of lessor importance, could be passed with caution
  3. The laminated came after the park royals. ? I taught it was the other way round , was it not lam->park royal -> craven
  4. More correctly it controlled the exit from the loop so I suspect it's in effect an outer home signal
  5. I notice a lot of signals had that orange type coloring. The reversing /call on signal on platform 4 was clearly of that orange type. Is it just faded red , I notice most of these were then painted a brighter " signal red" By the way we still haven't established when the lower semaphores of the other signals went to shunt signals 83 I beleive is when the up line gantry went in.
  6. Semaphore arms for me it is then ! I agree, with CTC, I think also thats when the gantry colour light light appeared at the end of platform 1 , displacing a ground mounted version
  7. The down signal is presumably sited next to a siding and high to allow it to be seen approaching from the North not the south Equally the inner home signal beside the South box, its actually situated beside the DOWN line, even though its refers to the UP line. I was always of the opinion that signals were sited next to the track they referred to , but clearly not in these cases
  8. Given its around the period Im interested , I do wonder when they were changed to shunt signals too, hard to tell.
  9. Amazing all is revealed when you search the net 39 isn't a shunt per say , just a starting signal for the loop Interesting semaphore 36 was removed in later years , yet visible in this photo Im drooling at the model signal opportunities
  10. Is this at mill town , which way is the train pointing , sorry of course he heading into the station, shows the confused signal I mentioned previously , what is that double signal ( 17 , 18) for, on a piece of track not used
  11. I also do do with help decoding signal 17 18 @ keanes and 39 40, was 39 a shunting signal ? what was the purpose of the 17, 18, why two signals Im trying to find a photo
  12. Heres a nice shot from 2001, interesting the tall signal to the right is the down signal, yet its actually position next to a siding The colours almost make this a model layout ! Interestingly I cant see that signal in this 1976 picture
  13. snapper, thanks, Ill review the signalling photos I have , I think I can see the "next" signal in all cases.
  14. Thanks, sorry I do understand quite a bit, what I don't understand about three aspect lights that are used as home signals, is the "caution", usually "caution" meant the next signal was red, but where there isn't a "next signal" what did caution mean ?
  15. and finally this is the best I've got so far of the south layout, but its from 2011 and Im not sure its representative , and its difficult to make out the plan, Ive not come across a clearer or one closers to the period
  16. Can someone help me in interpreting these signal layouts. Im not an expert on colour light and its seems from the installation of the direct curve, most of the north box was converted to colour light. Whats the purpose of the three aspect lights that seems to be indicated on these diagrams, was the third colour yellow, any photos of a typical CIE colour light of the time. Studioscale seem to have a design, is that representative I understand the third colour was white, from the top was it green white red , what did white mean ! Thanks , Im lost with coloured lights
  17. Thanks snapper, I have a later shot of the signal board, and that board only covers half the station
  18. Not sure how that would work, I mean the direct curve joins the passing loop very near the limerick end, effectively forcing trains to hold on the direct curve, and there is evidence that on occasion that was done ( IPRS rail tour for example) I can't really see what the passing loop was for, other then to provide a Limerick to Junction train to wait for a train the opposite way to get by. i.e. its was a passing loop for the Limerick line rather then anything specific to the "direct curve"
  19. Fantastic picture resource. Thank you very much Funny they didn't get the same detail inside the south cabin ( but I found another one for that ) The diagram confirms my memory that the outer signals on the Dublin side were a mix of semaphore and colour light by the late 70s I think I can start that track and signal plan now Any info much appreciated PS when I mentioned the moving of the north cabin I meant like 20-30 feet. But it could be just illusion Anyone have a picture of the signal board in the south cabin around the period in question
  20. Actually I disagree with high speed, much as I love railways. The case for ANY mainline heavy rail in a small under populated country Ike Ireland is futile. High speed lines simply make no sense over such distances , knocking 10-15 minutes off a journey to cork isn't going to solve IRs falling numbers The fact is motorways are cheaper, more convenient and faster over such short distances. Rail transport and especially IR s version of it will never be a practical or attractive option. IRs attempt to turn the railway carriage into a kind of glorified bus , just makes ... People use buses. At this stage it's hopeless. It's in a death spiral, look at the capital purchases, which are all " political" in nature , the Mk3 had years left in them, and could have been nicely refurbished , the engine population was more then adequate , then we suddenly had deDitrich stock and railcars, primarily justified by the " boo who " look at the money roads are getting , give us some , political nonsense
  21. Yep, we lost the plot in the 60s , everything old had no value , remember those diy articles that suggested covering up 6 panelled solid timber doors and , banisters with sheets of Formica , to " give a modern smooth clean appearance " god in heaven we were stupid ......
  22. Yes IR , if it had less branding and more focus on what passengers want , ........
  23. One wonders what was behind the thinking at miltown and the way the direct curve attached to the limerick line , were they anticipating a double track arrangement that was being mooted for Limerick around that time ? Heres the original north box
×
×
  • Create New...

Important Information

Terms of Use