jhb171achill Posted January 28 Author Posted January 28 8 minutes ago, irishrailways52 said: perhaps we could bring 800 back if we had a hand like that to lift it over the too low bridges Absolutely!!!!! Quote
DiveController Posted January 28 Posted January 28 1 hour ago, irishrailways52 said: perhaps we could bring 800 back if we had a hand like that to lift it over the too low bridges Often wondered why with its enthusiasm to augment the railbed, CIE felt it needed to completed ignore and reduce the loading gauge? Quote
Mike 84C Posted January 29 Posted January 29 Would the reduction in loading gauge be due to modern tamping machines require deep ballast under/around the sleepers to do their job properly? Better ask my track expert she works for Network Rail. 1 Quote
Recommended Posts
Join the conversation
You can post now and register later. If you have an account, sign in now to post with your account.