jhb171achill Posted January 28, 2024 Author Posted January 28, 2024 8 minutes ago, irishrailways52 said: perhaps we could bring 800 back if we had a hand like that to lift it over the too low bridges Absolutely!!!!!
DiveController Posted January 28, 2024 Posted January 28, 2024 1 hour ago, irishrailways52 said: perhaps we could bring 800 back if we had a hand like that to lift it over the too low bridges Often wondered why with its enthusiasm to augment the railbed, CIE felt it needed to completed ignore and reduce the loading gauge?
Mike 84C Posted January 29, 2024 Posted January 29, 2024 Would the reduction in loading gauge be due to modern tamping machines require deep ballast under/around the sleepers to do their job properly? Better ask my track expert she works for Network Rail. 1
Recommended Posts
Create an account or sign in to comment
You need to be a member in order to leave a comment
Create an account
Sign up for a new account in our community. It's easy!
Register a new accountSign in
Already have an account? Sign in here.
Sign In Now