Jump to content

Georgeconna

Members
  • Posts

    2,705
  • Joined

  • Last visited

  • Days Won

    31

Everything posted by Georgeconna

  1. Cheers Rich, Not doing much these days, gotta get the study done and then trains later, Thought I'd have the van done in about 4 hours. Wrong!! Hopefully i'll get into the full swing of things once June is gone Take it handy G
  2. Steve, Thanks, Des supplies decals with the kits so theres no need for extra expenditure!! BTW You posted a few bits to me the other week!! Cheers George
  3. Hi Lads, New site looks good boys, Hope it lasts a bit longer this time. Heres the lastest pic of the Brake van, Its all soldered construction and took a wee bit more time than I expected. I have not progressed much further as I have exams in June and pressure is on ( thank Christ that will be over and one with then except for a project for August ), Just really need to start to finish off the painting of the model and she's done. It's a credit to Des and the thought he put into the ease of contruction. There were 2 Step hangars missing from the etch but it was no big deal to scratch build them from spare brass (I thought I had lost them and spent a while looking about for them!!), I used a brass roof and I need to put on the rain steps, Handrails and Chimney. More pics of the etch n stuff on this link if your interested: http://irishscalemodeller.com/forum/viewtopic.php?f=44&t=23 Also just like the Clarify that the Scale Modeller site is not mine nor set up by me, I have not got time to scratch my behind not to mind looking after a forum!!! Cheers G
×
×
  • Create New...

Important Information

Terms of Use