Jump to content

warb

Members
  • Posts

    412
  • Joined

  • Last visited

  • Days Won

    91

Everything posted by warb

  1. Can be very hard watching some of the football at times
  2. front facade fitted and building topped out
  3. Lighting completed and fitted
  4. Last floor being added and rear wall with lights wiring to each floor.
  5. glenderg Just when I thought I was out...they pull me back in.
  6. just a reminder of how it use to be before IRM A class
  7. In 2001 the MRSI ran a show in cork to help the local model railway club. Greystones layout attended.
  8. nostalgia , that's what happens when you go through old negatives
  9. A long time ago as part of the MRSI club competition a diorama was constructed which a layout would be made from. The things you do in clubs.
  10. Grand canal dock station footbridge near completion with fine mesh fitted to over bridge
  11. latest update photos for barrow street
  12. next batch of styrene requiring work for barrow street
  13. where would we be without evergreen strip and plastikard
  14. While waiting for more styrene strips irish rail class 790 is started and appeared on barrow street
  15. Batch building remaining 90 ceiling girders and safety rails installed
  16. safety rails made and painted
  17. progress of sorts
  18. Sixth floor being installed to google buildings
  19. worn out at this stage
  20. John Memoires the good old days when they only way was to have a go yourself. I have photos of the 2700's single car and twins and 201's prior to paddy's 201 also some buildings have survived from greystones
  21. a few other photos of greystones (tony wright)
  22. Still to much work to do. Hopefully a year or 2 to go only back working on google building which i have not worked on for a while thanks
  23. more photos of greystones (tony wright)
  24. Transport boxes completed
×
×
  • Create New...

Important Information

Terms of Use