Jump to content

warb

Members
  • Posts

    414
  • Joined

  • Last visited

  • Days Won

    91

Everything posted by warb

  1. Just a thank you to all who have commented on barrow street overtime. When I started barrow street the majority of it was done with pencil and using 1.5mm plywood cut only with a stanley knife and or scalpel. As time moved on and with the help of CAD which was a god send even just for the amount of windows required for 40 plus buildings approx.(Just alone for the TCD building in excess of 90 windows). Like all, there is time i had to walk away and come back to do another bit.The main interest for me is the actual figuring out and completing different buildings/layout/parts and how it can be done and more importantly making a representation of a item with modellers licences. Again Thanks warb
  2. Houses getting ready for windows/painting and slating/gutters complete in island villa and greenore terrace.
  3. Found out at last.Here are a few shots of older buildings I made a while back. Harmony court and ideal standard building
  4. Original photos of island villa which the previous will be based on
  5. Afew photos of the start of the houses in island villa/greenore terrace /conway court and rostrevor court
  6. Jason previous photo of irish cement silo which might help
  7. Ho Ho Ho Now for the bad news barrow street has now gone to another place regards warb
  8. David It all started seeing a photo in Michael H.C Baker book The railways of the republic of ireland 1925 - 1975 of a push pull set passing Grand Canal Street Sidings (photo 1973) which captured a scene and hit a nerve to have a go albeit modern image in the 90's onwards.(photo 1 Michael H.C. Baker) regards warb
  9. warb

    Tara's

    Anybody have any photo's of tara's in pearse/boston sidings? regards warb
  10. warb

    Tara's

    the photo above looks as it is from a slide not original and maybe this is what is distorting the picture /colour
  11. might help regards
  12. Main controls completed for barrow street with circuit breakers on each dcc section and a separate 12v line
  13. David i can only work on half the layout at one time and as with all not enough space.here are some photos of what i have up at the moment regards
  14. Thanks David. I'll try the next time. photos of completed bridge 3 ft rule applies
  15. Only soldered wires previously. tried soldering brass box section to underneath of bridge gave up and glued evergreen section
  16. KMCE don't like it. give me plywood and evergreen sheets thanks warb
  17. pedestrian bridge between building on grand canal quay. First effort soldering.
  18. Gable end complete to google buildings.
  19. warb

    Warley

    Good luck with the launch tomorrow lads regards warb
  20. Final version of the footbridge installed
  21. version 2 of the pedestrian bridge
  22. Quite week on buildings for barrow street. Mock up made for pedestrian bridge to google buildings.
  23. Did I get planning permission? with difficulty
×
×
  • Create New...

Important Information

Terms of Use