Jump to content

warb

Members
  • Posts

    416
  • Joined

  • Last visited

  • Days Won

    91

Everything posted by warb

  1. Quite week on buildings for barrow street. Mock up made for pedestrian bridge to google buildings.
  2. Did I get planning permission? with difficulty
  3. front of google building complete
  4. minor works carried out including glazing fitted to ground floors
  5. Can be very hard watching some of the football at times
  6. front facade fitted and building topped out
  7. Lighting completed and fitted
  8. Last floor being added and rear wall with lights wiring to each floor.
  9. glenderg Just when I thought I was out...they pull me back in.
  10. just a reminder of how it use to be before IRM A class
  11. In 2001 the MRSI ran a show in cork to help the local model railway club. Greystones layout attended.
  12. nostalgia , that's what happens when you go through old negatives
  13. A long time ago as part of the MRSI club competition a diorama was constructed which a layout would be made from. The things you do in clubs.
  14. Grand canal dock station footbridge near completion with fine mesh fitted to over bridge
  15. latest update photos for barrow street
  16. next batch of styrene requiring work for barrow street
  17. where would we be without evergreen strip and plastikard
  18. While waiting for more styrene strips irish rail class 790 is started and appeared on barrow street
  19. Batch building remaining 90 ceiling girders and safety rails installed
  20. safety rails made and painted
  21. progress of sorts
  22. Sixth floor being installed to google buildings
  23. worn out at this stage
  24. John Memoires the good old days when they only way was to have a go yourself. I have photos of the 2700's single car and twins and 201's prior to paddy's 201 also some buildings have survived from greystones
×
×
  • Create New...

Important Information

Terms of Use