Jump to content

warb

Members
  • Posts

    425
  • Joined

  • Last visited

  • Days Won

    91

Everything posted by warb

  1. David i can only work on half the layout at one time and as with all not enough space.here are some photos of what i have up at the moment regards
  2. Thanks David. I'll try the next time. photos of completed bridge 3 ft rule applies
  3. Only soldered wires previously. tried soldering brass box section to underneath of bridge gave up and glued evergreen section
  4. KMCE don't like it. give me plywood and evergreen sheets thanks warb
  5. pedestrian bridge between building on grand canal quay. First effort soldering.
  6. Gable end complete to google buildings.
  7. warb

    Warley

    Good luck with the launch tomorrow lads regards warb
  8. Final version of the footbridge installed
  9. version 2 of the pedestrian bridge
  10. Quite week on buildings for barrow street. Mock up made for pedestrian bridge to google buildings.
  11. Did I get planning permission? with difficulty
  12. front of google building complete
  13. minor works carried out including glazing fitted to ground floors
  14. Can be very hard watching some of the football at times
  15. front facade fitted and building topped out
  16. Lighting completed and fitted
  17. Last floor being added and rear wall with lights wiring to each floor.
  18. glenderg Just when I thought I was out...they pull me back in.
  19. just a reminder of how it use to be before IRM A class
  20. In 2001 the MRSI ran a show in cork to help the local model railway club. Greystones layout attended.
  21. nostalgia , that's what happens when you go through old negatives
  22. A long time ago as part of the MRSI club competition a diorama was constructed which a layout would be made from. The things you do in clubs.
  23. Grand canal dock station footbridge near completion with fine mesh fitted to over bridge
  24. latest update photos for barrow street
×
×
  • Create New...

Important Information

Terms of Use