Jump to content

warb

Members
  • Posts

    412
  • Joined

  • Last visited

  • Days Won

    91

Everything posted by warb

  1. David Got it in one baseboard crates(coffins) for storage.20 sheets of ply in total for barrow street
  2. First of six completed for barrow street.
  3. Another update on two buildings of rostrevor court for barrow street which have been a pain to do. Main buildings complete now for paths and exterior landscaping to do.
  4. The dogs dangly bits as usual from him goodself modelling to the highest standard.I think that sums it up.red eye flight to stevenage this morning Regards Warb
  5. Roofs complete and ready for glazing to rostrevor court on barrow street
  6. Having been quite for a while and slightly tired, I had given up working on some building on Barrow Street. Now with the new year I have restarted working on Rostrevor Court, hopefully the last of the main buildings required for Barrow Street and then on to detailing of all the buildings and completion of the overhead catenary. Regards warb
  7. Thanks David, It helps with the IRM buffer stops Regards Warb
  8. New installations started on barrow street
  9. Quiet time on barrow street except for these arrivals regards warb happy christmas
  10. Photos of the train shed harcourt street warb
  11. joe123 Kytes lights can supply https://www.kyteslights.com/
  12. warb

    Sealink

    hydey the following link is for bachmann mk1 sealink coaches on ebay https://www.ebay.ie/itm/8-X-BACHMANN-SEALINK-COACHES-39-032/143431185203?hash=item21652a3333:g:vYYAAOSwxH1dvv3X
  13. Minor repairs and still running!!!!
  14. warb

    Irish buses.

    In the early 1980's a bedford OB on hire was used by rael-brook shirt factory (skerries shirts)in blackrock county dublin to provide transport home for its staff. Prior to the bedford ob they used their ford D series box van which in the evening they converted by adding seats around the perimeter for the same purpose(Prior to H&S)
  15. model of jess class 721
  16. I hate to mention the C word but yesterday with the help of some elves visitors dropped in on barrow street. Absolutely stunning work by IRM and all the staff involved,can't wait to get hold of these beauties and i'm tempted with a certain class 55 when you see it in the flesh on a rosslare run. Warb
  17. Next batch of brass wire(100) arrived for overhead catenary for barrow street
  18. top class modelling coming together nicely as usual
  19. halfway there with overhead catenary on barrow street
  20. Top Class pure engineering
  21. A little more progress
  22. top class as ever
  23. leslie your correct it is knitting regards warb
  24. thanks leslie I have a feeling it will only be cosmetic regards warb
  25. second line started
×
×
  • Create New...

Important Information

Terms of Use