Jump to content

warb

Members
  • Posts

    412
  • Joined

  • Last visited

  • Days Won

    91

Everything posted by warb

  1. Last bits added to st andrews church and by the way who said Dcc is two wires? Fitted Fans to the rear of the control panel
  2. The final few bits added to st andrews church louvres/windows
  3. Favourite Layouts Have to agree with your comment regarding narrow mindness. Three layouts which i would watch and suddenly a few hours are gone by are O Gauge holiday haunts,EM gauge lime street and HO hasselt.
  4. Some progress on st andrews church
  5. Something else warb
  6. Finally got the slating done now for the rest of the building
  7. David To try and keep the slating straight pencil lines were drawn on the roof at 20 mm interval to help to keep them someway straight Thanks Warb
  8. Back to normal work. Slating a roof is not all cracked up to be even in model form. Next batch ready for installation
  9. new video of barrow street with spoil wagons
  10. I find the contact glue better and does not lift when in place as per pva and i find it quicker to install but still a pain.
  11. Here we go with the slating and a few slating strips cut out and a bit of glue
  12. Update regarding barrow street now for the process of slating the church roof with the valley and gutters fitted
  13. Last piece of the overhead pelmet being installed to barrow street
  14. Update on the work making of the roof/roofline of st andrews church westland row
  15. A little more progress and another project
  16. Haven't posted for a while as i was in the process of shifting the layout to allow for other works at the northern end at pearse station. Part of this work is the making of the roof/roofline of st andrews church westland row which also back on to cumberland street south here some photos of the progress.(Kildare street branch diverting immediately within the station area) Warb
  17. Photo of Keg liner cage in 2000 warb
  18. New video of barrow street
  19. Dart8118 As far i remember brick painted and one section was plastered. If You look carefully you can see an advertisement for mattersons on the tank regards warb
  20. As far as i'm aware they are only used for storage as there is a dividing wall to support the water tank warb
  21. some photo's of mk3 international coaches
×
×
  • Create New...

Important Information

Terms of Use