Popeye The railing was drawn on autocad and cut on a laser cutter. It normally takes a few hours to draw and approx 15 min to cut
-
- 775 replies
-
- 17
-
-
-
-
-
- 775 replies
-
- 13
-
-
-
- 775 replies
-
- 12
-
-
-
-
- 261 replies
-
- 21
-
-
-
- 775 replies
-
- 12
-
-
First mock up and timber cut for the school on cumberland street south and to the rear of st andrews church
- 775 replies
-
- 14
-
-
-
What can we say to paddy only thank you for what he has done over the years. When i stared there was nothing except repaints and or scratch build your own which i and others had to do. Paddy you're a legend. thanks paddy warb Noel Dodd
-
Wrenneire,give me a break I only started it when the spanish flu was on the go
-
Last bits added to st andrews church and by the way who said Dcc is two wires? Fitted Fans to the rear of the control panel
- 775 replies
-
- 10
-
-
-
- 775 replies
-
- 12
-
-
-
Favourite Layouts Have to agree with your comment regarding narrow mindness. Three layouts which i would watch and suddenly a few hours are gone by are O Gauge holiday haunts,EM gauge lime street and HO hasselt.
-
- 775 replies
-
- 16
-
-
-
Something else warb
-
- 775 replies
-
- 16
-
-
-
-
David To try and keep the slating straight pencil lines were drawn on the roof at 20 mm interval to help to keep them someway straight Thanks Warb
-
Back to normal work. Slating a roof is not all cracked up to be even in model form. Next batch ready for installation
- 775 replies
-
- 10
-
-
-
new video of barrow street with spoil wagons
- 775 replies
-
- 12
-
-
I find the contact glue better and does not lift when in place as per pva and i find it quicker to install but still a pain.
-
-
Update regarding barrow street now for the process of slating the church roof with the valley and gutters fitted
- 775 replies
-
- 17
-
-