Jump to content

warb

Members
  • Posts

    415
  • Joined

  • Last visited

  • Days Won

    91

Everything posted by warb

  1. As far as i'm aware they are only used for storage as there is a dividing wall to support the water tank warb
  2. some photo's of mk3 international coaches
  3. New flow to arklow on barrow street
  4. art installation
  5. another installment
  6. refurb dart pictures works ongoing
  7. Some progress on dart units for barrow street
  8. I have been asked to show the video without backgroung music here's the link wit a little extra at the end regards Warb
  9. Please find link to new video
  10. Noel The bodys are evergreen styrene sheets and the roof is isopon with plastikard warb
  11. Work ongoing to the dart roof and units
  12. On a steep learning curve regarding videos updated version of the above barrow_street_01_06_2020.mp4
  13. First ever try of video of barrow street MAH00002.MP4 MAH00008.MP4
  14. Update regarding build of dart units Class 8100 for barrow street
  15. First trial run of class 8100 dart units on barrow street
  16. Man Alive that looks like a torturous job, Take it they are computer cut out? Mixture of laser and router to machine them out
  17. While working on harmony court sod law I discovered that i ran out of materials. So to keep going in the lock down work commence on scratch building class 8100 Dart units.
  18. First mock up of wall glazing to harmony court
  19. Photo of boston sidings with dmu stock awaiting their next turn.
  20. https://3dprintingcorner.co.uk/product/1-76-modern-platform-bench-5/ Rob this might help
  21. JHB again scratch built 20 years ago with lima chassis Thanks Warb
  22. Forgot one dmu
  23. MM Scratch build with Bachmann 150 chassis warb
×
×
  • Create New...

Important Information

Terms of Use