Jump to content

warb

Members
  • Posts

    425
  • Joined

  • Last visited

  • Days Won

    91

Everything posted by warb

  1. Update regarding build of dart units Class 8100 for barrow street
  2. First trial run of class 8100 dart units on barrow street
  3. Man Alive that looks like a torturous job, Take it they are computer cut out? Mixture of laser and router to machine them out
  4. While working on harmony court sod law I discovered that i ran out of materials. So to keep going in the lock down work commence on scratch building class 8100 Dart units.
  5. First mock up of wall glazing to harmony court
  6. Photo of boston sidings with dmu stock awaiting their next turn.
  7. https://3dprintingcorner.co.uk/product/1-76-modern-platform-bench-5/ Rob this might help
  8. JHB again scratch built 20 years ago with lima chassis Thanks Warb
  9. Forgot one dmu
  10. MM Scratch build with Bachmann 150 chassis warb
  11. DMU friday on barrow street
  12. Work started back on the last office building Harmony Court on Harmony Row/Brunswick Place which was one of the first buildings started a long time ago. As Time moved on different methods of construction would now be used if i was starting to build it now.
  13. Still messing around with detailing
  14. Another small bit done adding detail to the layout
  15. More minor work to barrow street
  16. Magical as usual.
  17. Detail slowly being added to barrow street.
  18. Back in time
  19. On My way
  20. Working on the rest of rostrevor court/island villas and maken street flats
  21. Feels like it at times
  22. Falling back on other jobs which required works to the rear extensions of island villa houses on barrow street
  23. David A few photos of my workshop which has been built over a lot of years and had the space to build a workshop. The major items are the TV/Radio and fridge for self isolation even before now. The only problem is that barrow street cannot be fully installed to allow for full running but i have smaller sections to allow this.
  24. Final section completed of the overheads on barrow street.
  25. Another section completed one more to do in the station area. Hurray
×
×
  • Create New...

Important Information

Terms of Use