Jump to content

warb

Members
  • Posts

    415
  • Joined

  • Last visited

  • Days Won

    91

Everything posted by warb

  1. DMU friday on barrow street
  2. Work started back on the last office building Harmony Court on Harmony Row/Brunswick Place which was one of the first buildings started a long time ago. As Time moved on different methods of construction would now be used if i was starting to build it now.
  3. Still messing around with detailing
  4. Another small bit done adding detail to the layout
  5. More minor work to barrow street
  6. Magical as usual.
  7. Detail slowly being added to barrow street.
  8. Back in time
  9. On My way
  10. Working on the rest of rostrevor court/island villas and maken street flats
  11. Feels like it at times
  12. Falling back on other jobs which required works to the rear extensions of island villa houses on barrow street
  13. David A few photos of my workshop which has been built over a lot of years and had the space to build a workshop. The major items are the TV/Radio and fridge for self isolation even before now. The only problem is that barrow street cannot be fully installed to allow for full running but i have smaller sections to allow this.
  14. Final section completed of the overheads on barrow street.
  15. Another section completed one more to do in the station area. Hurray
  16. Spray booth completed for a change from barrow street
  17. Was very tempted by having the posts only regards warb
  18. Done it already a few F---- said.
  19. Like yourself 3 times cut(grass only)
  20. 21 feet of overhead catenary completed to date on barrow street
  21. work still ongoing to barrow street
  22. First bit of the overheads completed at the end of grand canal dock station platform/boston sidings
  23. Weekend of soldering and redoing of overhead catenary which has now reached grand canal dock station platforms
  24. the slow march of the overheads
  25. Just about
×
×
  • Create New...

Important Information

Terms of Use