Jump to content

Four Car 22000 Trial

Rate this topic


Recommended Posts

Probably a compromise for increased capacity on lines with platforms that are too short to accommodate six-car sets.

 

Any sign of selective door opening being installed?

 

No, this enables a better match of capacity to demand. Several services, such as the 1310 Westport - Heuston are very busy as a 3 car but too much as a 6 car.

Link to comment
Share on other sites

After the 4 car trial with 22045 on Wednesday 3rd July, vehicle 22445 was re-inserted into the set to trial a 5 car formation. The set operated a trial to Ballybrophy and the return working is pictured at Clonkeen Bridge. Also Loco 072 operated Portlaoise - Portarlington Light Engine to bring a panel train to Wexford for Engineering Works at Wexford Yard.

http://smu.gs/12JnSpl

 

The Wanderer.

Edited by thewanderer
Link to comment
Share on other sites

Join the conversation

You can post now and register later. If you have an account, sign in now to post with your account.

Guest
Reply to this topic...

×   Pasted as rich text.   Paste as plain text instead

  Only 75 emoji are allowed.

×   Your link has been automatically embedded.   Display as a link instead

×   Your previous content has been restored.   Clear editor

×   You cannot paste images directly. Upload or insert images from URL.

×
×
  • Create New...

Important Information

Terms of Use