Sulzer201 Posted August 30, 2015 Posted August 30, 2015 Recently I had a go at attempting to represent a couple of D.S.E.R. stations, Rathnew and Wicklow Mainline. Rathnew was a single platform station with a short siding which was lifted in the early part of the 20th C the station closed in 1964 along with numerous other smaller stations on this route. The station is located in a cutting and the station house is now private, the platform was removed during the installation of the mini ctc. Less than two miles to the east is Wicklow Mainline which is still in use this station has a loop and short PW siding, located just before the bridge over the Vartry river. Unlike, Rathnew station, Wicklow is a fair distance from the town centre and it was opened later than Wicklow Murrough, now long since closed. I will try and improve this work as I go and I'm attempting to develop my skills. Wicklow will be next and I would be glad of any advice for modelling the unusual signal box and footbridge and the lovely old red brick and glass waiting room on the 'up side' which has been closed off to the public for many years - also any ideas on platforms? Thanks for having a look. 1 Quote
Sulzer201 Posted September 12, 2015 Author Posted September 12, 2015 Started laying out the platforms for 'Wicklow' and want to get the back-scenes and maybe attempt a scratch build of the old red brick and glass waiting room. A short engineers train made a trip through Rathnew (closed) and Wicklow mainline. Quote
Hunslet 102 Posted September 13, 2015 Posted September 13, 2015 Liked the video,layout is shaping up to be a good one,looking forward to your progress. Quote
Sulzer201 Posted September 27, 2015 Author Posted September 27, 2015 Getting a bit more done at my attempt to represent Wicklow Mainline, lots of details to be added and improvements needed, a work in progress. Quote
enniscorthyman Posted September 27, 2015 Posted September 27, 2015 Great work,she's comming along well. Quote
Sulzer201 Posted October 10, 2015 Author Posted October 10, 2015 An engineers train is seen running along the D.S.E.R. single track sections and enters the loop at Wicklow mainline to cross a returning Arklow bank holiday relief service. Big GM 112 has been visiting Inchicore for minor modifications and was sent down on a test run to Arklow. After exchanging staffs the engineers train continues on its journey to Beleece to be loaded with ballast for the next possession - in the Wicklow - Rathdrum section. Quote
enniscorthyman Posted October 11, 2015 Posted October 11, 2015 Very nice Tommy. 039 looks great and seems a smooth runner.112 is class with the sound. Quote
Sulzer201 Posted October 11, 2015 Author Posted October 11, 2015 Thanks Eamonn and delighted with 039 a very smooth runner since the transplant and thanks to your skills there. Delighted with that latest sound chip and next would love one for a 141 but hopefully the 121s will intervene before that happens! Quote
Sulzer201 Posted December 17, 2015 Author Posted December 17, 2015 I have now dismantled the old "Brickworks" layout and concentrating on the much smaller D.S.E.R. stations representing Wicklow and Rathnew (closed) in the days of loco hauled trains. The layout is small and simple and all the track-work is easy got at for cleaning, fault-finding etc. It is a basic layout and I will hopefully improve my skills as we go along. I only run a couple of locos at a time and this keeps things simple, the power supply is dcc. I'm enjoying running the layout at present and I will improve things - here is a short clip, the pw train is made up of cheap hornby open wagons and the poorly build tankers - carrying heavy oil for shelton - are from Dapol kits. Quote
Sulzer201 Posted October 2, 2016 Author Posted October 2, 2016 A small layout for the youngest son and adding to that as time goes by. A run by Lima 201 and MK III push/pull set. Quote
Sulzer201 Posted December 1, 2016 Author Posted December 1, 2016 (edited) A bit of running with a C class heading a special for Shelton and a pair of GMs running light engine to Wicklow to pick up empty stock. Lots of work to be done on the PW and Scenery! Edited December 9, 2016 by BosKonay 1 Quote
Sulzer201 Posted February 25, 2017 Author Posted February 25, 2017 203 River Corrib taking a run with the MK III Push/pull set today. Quote
Recommended Posts
Join the conversation
You can post now and register later. If you have an account, sign in now to post with your account.