Sulzer201 Posted January 25, 2017 Posted January 25, 2017 Nice bit of shunting in this clip with a little 'bump' at end. 1 Quote
Railer Posted January 26, 2017 Posted January 26, 2017 Except for the 10;15 mark. Can't believe the shunters didn't tell the driver to back off a bit when pushing the empty flats to the front of the IWT liner. One of the wagons actually jumped at the impact. Quote
DiveController Posted January 27, 2017 Posted January 27, 2017 Except for the 10;15 mark. Can't believe the shunters didn't tell the driver to back off a bit when pushing the empty flats to the front of the IWT liner. One of the wagons actually jumped at the impact. Exactly. It's hard to judge a foot or two with an obstructed view over 100 feet away. Think the driver was waiting for the signal but none was actually given. The liner seemed pretty solid Quote
Mayner Posted January 27, 2017 Posted January 27, 2017 Its hard to believe that IE are still relying on hand signals for shunting 20-30 year after most railways including British Rail adapted 2 way radio communication, especially in a yard like East Wall with curving roads where its difficult to maintain a clear line of sight between the driver and the shunting crew on the gound. The shunter controlling the move should have signalled the driver to stop 1-2 wagon lengths back from the Liner until he (the shunter) could accurately judge the distance between the Liner and his cut of wagons. In the States & New Zealand the brakeman or shunter unsually rides on the end car to reduce the amount of walking, chopper or knuckle couplers have largely eliminated the risk of being squashed between cars while coupling up. Quote
Recommended Posts
Join the conversation
You can post now and register later. If you have an account, sign in now to post with your account.