Jump to content

warb

Members
  • Posts

    424
  • Joined

  • Last visited

  • Days Won

    91

Everything posted by warb

  1. Starting back on the overheads for barrow street
  2. Signals installed and connected
  3. Pearse station platform end signals ready for fitting
  4. Ground signals fitted awaiting connection on barrow street
  5. Latest building finished and in situ on the layout
  6. Another day finnish buildings for barrow street
  7. houses in situ on barrow street and make up of the doors
  8. Finally the door and windows complete on island villa which has taken most of a day
  9. More view of cumberland street south on barrow street
  10. Station throat and platform ends at pearse station
  11. 2600 in boston sidings
  12. Photos of grand canal quay/boston sidings in progress
  13. other views of greenore terrace
  14. Graffiti on the way
  15. Update of buildings on barrow street.
  16. forgive the quality of the photos as i am only using a ancient fuji camera
  17. Signals installed and working on barrow street
  18. For my previous layout greystones from the 90's i had to do the same with lima mk3's as i had not got enough stock at the time
  19. Seeing the Cad drawings of Paddy's beautiful cad drawings of 121 class I had a look at my scratchbuilt unfinished items box and came across the following in O gauge. Some day!
  20. island villa ready for installation on barrow street
  21. To close off this weekends work some doors/curtains/blinds fitted
  22. Canopies fitted and painted
  23. Mock of canopies for houses
  24. As with the thread roundhouses in ireland here are photos of the same location on barrow street under construction
×
×
  • Create New...

Important Information

Terms of Use