Jump to content

warb

Members
  • Posts

    426
  • Joined

  • Last visited

  • Days Won

    91

Everything posted by warb

  1. latest update photos for barrow street
  2. next batch of styrene requiring work for barrow street
  3. where would we be without evergreen strip and plastikard
  4. While waiting for more styrene strips irish rail class 790 is started and appeared on barrow street
  5. Batch building remaining 90 ceiling girders and safety rails installed
  6. safety rails made and painted
  7. progress of sorts
  8. Sixth floor being installed to google buildings
  9. worn out at this stage
  10. John Memoires the good old days when they only way was to have a go yourself. I have photos of the 2700's single car and twins and 201's prior to paddy's 201 also some buildings have survived from greystones
  11. a few other photos of greystones (tony wright)
  12. Still to much work to do. Hopefully a year or 2 to go only back working on google building which i have not worked on for a while thanks
  13. more photos of greystones (tony wright)
  14. Transport boxes completed
  15. While going through old photos(quality not great) i found photos of the original greystones layout when i started. If the baseboards look familiar the now have barrow street on them which were built in 1989/90 and still have not given any problems.This was before murphy models/IRM ect and all was scratched built.If i find any more photos i will post them. regards
  16. i will use both foam stops and card slips when i get around to it regards
  17. stock boxes completed for barrow street
  18. minor works completed including backscene and front pelmet raised due to google buildings and template made for bridge access between buildings
  19. Photo of bogie on Mk3 that might help on 6307
  20. New signage completed and fitted
  21. Please find attached old photos of ballast plough wagons. the quality are not great as i can not find the originals regards
  22. small improvements to barrow street
  23. bungalow with a hole in the roof
  24. Small update new footpaths fitted to barrow street and front plinth varnished
  25. re arranged barrow street end full weekend of works where does it go
×
×
  • Create New...

Important Information

Terms of Use