Jump to content

Middlemark

Rate this topic


Recommended Posts

Posted

Completed embankment slopes installed on the layout.  

AD5CA0A9-0994-4CA7-B162-D2902154596F.jpeg.d59aaacecff0900757c63e5a42b0fc2e.jpeg

DBD6C4D7-82EF-4559-B736-BB10F63A209A.jpeg.e4738eff1f5816360e5c147b7e40941c.jpeg

2611F541-2FE4-4424-94A0-931578A44EEE.jpeg.78a504c95a5d99addf20e5e6e836d867.jpeg

DA7AB8EB-61C6-4464-8D1C-B9608BDA6C09.jpeg.e9674c8798a29d69b52bbd7a5ad6c350.jpeg

They are designed to be push fit only (i.e.  not glued in place) so they can be removed to get access to point motors etc. for the upper track level.

Cheers

Darius

  • Like 3
  • 2 weeks later...
  • 2 weeks later...
  • 2 weeks later...
Posted (edited)

The MGR train did several circuits after which the magnetic couplings began to fail as shown below.

D2A0FE89-5BB7-4DF2-8353-0F59948D95CC.thumb.jpeg.b5a08c2ebfc37156800b98154e8254c8.jpeg

The couplings are from West Hill Wagon Works and are the latest of several failures I have had with their couplings.  I am forced to conclude that they have a good concept but their execution and engineering is poor.  Alas I won’t by buying anything else from them in future.

I plan to make my own fixed bar couplings (like I did with the Freightliner Flats) and create permanently coupled rakes of 5 wagons with tension locks at each end.

Cheers

Darius

Edited by Darius43
  • Like 2
Posted (edited)

Some more stock running in the shed today.

Hornby MGR wagons behind a Bachmann Class 37.
 

 

 

3DWagonWorks JGA cement wagons behind a Bachmann Class 66.

 

Hornby Class 101 DMU (with Express Models head/tail lights fitted) and Bachmann Class 108 DMU.

 

 

Ian Kirk kit built articulated suburban coaches behind an Oxford Rail N7.
 


KR Models GT3 hauling modified Triang Mk1 coaches.

Cheers

Darius

Edited by Darius43
  • Like 2
  • 3 weeks later...
  • 2 weeks later...
  • 2 weeks later...
  • 1 month later...
Posted (edited)

Hornby APT taken for a spin on the layout this morning - all fourteen coaches 😀

 

 


 


 


 

 

The full APT successfully negotiated the helix down to the lower storage level - at least in the downwards direction…


We’ll check upwards next week.

Cheers

Darius

Edited by Darius43
  • Like 3
  • 3 weeks later...
  • 2 weeks later...
  • 3 weeks later...
Posted

Middlemark is now being dismantled prior to its moving to a new home where we will rebuild it.

We have the technology.  It will be better than before.

Cheers

Darius

  • Like 1
  • 3 months later...
Posted

The layout has now been dismantled in preparation for my friend’s (and shed owner) house move in March. 

A brand new shed is to be erected at the new house and the layout will be reinstalled in the new shed.

Dismantling was undertaken with minimal damage to the “scenic” part of the layout.

The new shed will allow us to iron out the bugs that were popping up with the original layout concept.

Watch this space…

Cheers

Darius

  • Like 4

Join the conversation

You can post now and register later. If you have an account, sign in now to post with your account.

Guest
Reply to this topic...

×   Pasted as rich text.   Paste as plain text instead

  Only 75 emoji are allowed.

×   Your link has been automatically embedded.   Display as a link instead

×   Your previous content has been restored.   Clear editor

×   You cannot paste images directly. Upload or insert images from URL.

×
×
  • Create New...

Important Information

Terms of Use