-
Posts
8,913 -
Joined
-
Days Won
2
Content Type
Profiles
Forums
Events
Gallery
Blogs
Everything posted by BosKonay
-
Sorry lads. Some over eager security settings Should be all good now!
-
-
Sounds like an issue with your ISP, you could disconnect and reconnect, or reboot the PC will fix it
-
Can you try that now heirflick?
-
Murphy Models 071 - New, detailed pre-production photos added!
BosKonay replied to Admin's topic in Irish Models
Just spotted a notice from Hattons: Murphy Models MM0112 Irish Class 071/111 diesel locomotive "Northern Counties" in NIR blue livery (as on loan to IE) £125.00 Our latest information from the supplier suggests this item will arrive with us on or after Thursday 1st November 2012 Whilst we are hopeful this information is accurate, manufacturer lead times are frequently prone to be delayed. This information is to be used as a guide only. We hope that this email has been useful. -
Layout in progress { no laughing please im a newbie }
BosKonay replied to fitzguttentite's topic in Irish Model Layouts
YouTube you can embed here allright but any vid would be cool -
I'd say a roof is a year away Priority is a running loop now
-
I've been experimenting with polyfilla. The problem is that the proper terminus concrete laid stuff, has the chairs and rail mounted to the concrete. I can't reproduce that look at all using peco track and filler / etc. So I'm going to compromise and use regular ballast in the terminus roads, and do a good job of the over-roof to make it less obvious
-
Layout in progress { no laughing please im a newbie }
BosKonay replied to fitzguttentite's topic in Irish Model Layouts
Any pics of the lamps in action ? -
It denotes the programming track It's connected via a DPDT switch so I can toggle it from main back to programming, etc, so I can drive a loco onto it, flip to programming to interrogate or programme the decoder, then flip it back to main to drive it out again
-
Cheers Rich, I think I have in my head what it's 'supposed' to look / work like Although adding signals to these baby is on the loooong end of the todo
-
There is physical space to add back in the dock / cement terminal, but I reckon one thing at a time!
-
-
From what I am reading I will need TPSW grids (pairs) before the buffers in the terminus and at every signal / platform end...., then again on the mainline at signals and in advance of crossings, etc. Has anyone any good references, or photos of Irish AWS/TPSW stuff?
-
And the beginning of dummy point motor installation.. Anyone know where I might find details on where the AWS / TPWS and various boxes and detectors and thingies 'should' go?
-
-
Layout in progress { no laughing please im a newbie }
BosKonay replied to fitzguttentite's topic in Irish Model Layouts
You are flying at some pace!!! -
I think I'd get dizzy trying to stop 4 crashing!!
-
Was worth a try
-
Looking brilliant!! How many trains are you running on the same loop there!
-
At times like this your arms feel the full length!
-
Small update: Terminus and yards now have been undercoated in a lovely shade of jet black, in advance of platform installation, ballasting and rail painting (in reverse order!)
-
http://www.rail-reg.gov.uk/server/show/nav.1559
.png.c363cdf5c3fb7955cd92a55eb6dbbae0.png)