Jump to content

warb

Members
  • Posts

    412
  • Joined

  • Last visited

  • Days Won

    91

Everything posted by warb

  1. Another small bit done adding detail to the layout
  2. More minor work to barrow street
  3. Magical as usual.
  4. Detail slowly being added to barrow street.
  5. Back in time
  6. On My way
  7. Working on the rest of rostrevor court/island villas and maken street flats
  8. Feels like it at times
  9. Falling back on other jobs which required works to the rear extensions of island villa houses on barrow street
  10. David A few photos of my workshop which has been built over a lot of years and had the space to build a workshop. The major items are the TV/Radio and fridge for self isolation even before now. The only problem is that barrow street cannot be fully installed to allow for full running but i have smaller sections to allow this.
  11. Final section completed of the overheads on barrow street.
  12. Another section completed one more to do in the station area. Hurray
  13. Spray booth completed for a change from barrow street
  14. Was very tempted by having the posts only regards warb
  15. Done it already a few F---- said.
  16. Like yourself 3 times cut(grass only)
  17. 21 feet of overhead catenary completed to date on barrow street
  18. work still ongoing to barrow street
  19. First bit of the overheads completed at the end of grand canal dock station platform/boston sidings
  20. Weekend of soldering and redoing of overhead catenary which has now reached grand canal dock station platforms
  21. the slow march of the overheads
  22. Just about
  23. Overhead catenary reach boston sidings
  24. new stock on barrow street
  25. stunning work as usual at a higher level
×
×
  • Create New...

Important Information

Terms of Use