Meanwhile, back at Omagh North, I have started the wiring of the layout. I am wiring and testing the entire layout on the surface, using masking tape to fix cables between and under tracks. When everything is wired, test and running well I will have to come up with a plan of getting it all wired permanently under the baseboard top and out of sight≥