Yesterday Omagh North took a backward step, though for the better! I have repositioned my DPDT switches from the baseboard top to the edge of the framing out of sight. I filled the opening with a very neatly fitted piece of ply. This also means that I can erect a proper background, if I ever go public.
During the process I decided that the wiring, which looked a terrible, should be stripped and a fresh start made. This time I want to route the cases along the inside edges of the baseboard frame before exiting at the front panel. The rewiring will be thoughtful and involve labelling everything for future movement. A box of cable clips will contribute to the tidy up. All areas under paintwork and track work will be left cable free for possible electronic point controls in future.
Question:
If I have fixed track work to a 3mm cork roll underlay, can my Peco platform edging strips be fixed to the cork also or do I need to fix to plywood baseboard level to maintain true scale heights?