Jump to content

warb

Members
  • Posts

    412
  • Joined

  • Last visited

  • Days Won

    91

Everything posted by warb

  1. New flow to arklow on barrow street
  2. art installation
  3. another installment
  4. refurb dart pictures works ongoing
  5. Some progress on dart units for barrow street
  6. I have been asked to show the video without backgroung music here's the link wit a little extra at the end regards Warb
  7. Please find link to new video
  8. Noel The bodys are evergreen styrene sheets and the roof is isopon with plastikard warb
  9. Work ongoing to the dart roof and units
  10. On a steep learning curve regarding videos updated version of the above barrow_street_01_06_2020.mp4
  11. First ever try of video of barrow street MAH00002.MP4 MAH00008.MP4
  12. Update regarding build of dart units Class 8100 for barrow street
  13. First trial run of class 8100 dart units on barrow street
  14. Man Alive that looks like a torturous job, Take it they are computer cut out? Mixture of laser and router to machine them out
  15. While working on harmony court sod law I discovered that i ran out of materials. So to keep going in the lock down work commence on scratch building class 8100 Dart units.
  16. First mock up of wall glazing to harmony court
  17. Photo of boston sidings with dmu stock awaiting their next turn.
  18. https://3dprintingcorner.co.uk/product/1-76-modern-platform-bench-5/ Rob this might help
  19. JHB again scratch built 20 years ago with lima chassis Thanks Warb
  20. Forgot one dmu
  21. MM Scratch build with Bachmann 150 chassis warb
  22. DMU friday on barrow street
  23. Work started back on the last office building Harmony Court on Harmony Row/Brunswick Place which was one of the first buildings started a long time ago. As Time moved on different methods of construction would now be used if i was starting to build it now.
  24. Still messing around with detailing
×
×
  • Create New...

Important Information

Terms of Use