warb
Members-
Posts
399 -
Joined
-
Last visited
-
Days Won
89
Content Type
Profiles
Forums
Resource Library
Events
Gallery
Blogs
Store
Community Map
Everything posted by warb
-
In the early 1980's a bedford OB on hire was used by rael-brook shirt factory (skerries shirts)in blackrock county dublin to provide transport home for its staff. Prior to the bedford ob they used their ford D series box van which in the evening they converted by adding seats around the perimeter for the same purpose(Prior to H&S)
-
-
I hate to mention the C word but yesterday with the help of some elves visitors dropped in on barrow street. Absolutely stunning work by IRM and all the staff involved,can't wait to get hold of these beauties and i'm tempted with a certain class 55 when you see it in the flesh on a rosslare run. Warb
- 738 replies
-
- 10
-
-
top class modelling coming together nicely as usual
-
- 738 replies
-
- 14
-
Top Class pure engineering
-
- 738 replies
-
- 13
-
top class as ever
-
-
thanks leslie I have a feeling it will only be cosmetic regards warb
-
- 97 replies
-
- 4
-
- weedspray
- 42 ft flat
-
(and 2 more)
Tagged with:
-
Works ongoing to barrow street. First time making overhead catenary made a total bags on first shot but getting there.
-
-
-
-
- 738 replies
-
- 17
-
- 738 replies
-
- 15
-
-
-
-
Sods law when you start something you never have enough styrene strip to finish the glazing bars on the roof of the station on barrow street
- 738 replies
-
- 10
-
Updated photos of the roof on pearse station on barrow street with new glazing and roofing.Now for the long process of fitting approx 420 glazing bars to one side.
- 738 replies
-
- 10
-
- 738 replies
-
- 16