Jump to content

Irish Railway News ‘Enterprise Watch’

Rate this topic


Recommended Posts

Posted

Last night the 19:00 Connolly - Belfast was +42mins late into Belfast,  anti social behaviour at Drogheda.

Unfortunately the return 21:28 from Belfast struck an animal between Dundalk and Drogheda. Eventual arrival time in Dublin was 00:40hrs.

Expect there to be a possible banger on the 10am ex Connolly… @jhb171achill

Posted
2 hours ago, IrishTrainScenes said:

Last night the 19:00 Connolly - Belfast was +42mins late into Belfast,  anti social behaviour at Drogheda.

Unfortunately the return 21:28 from Belfast struck an animal between Dundalk and Drogheda. Eventual arrival time in Dublin was 00:40hrs.

Expect there to be a possible banger on the 10am ex Connolly… @jhb171achill

As in a Castle Class or an MED; or a 2-car 2600……?

Posted

Cross-Border Train Alterations - Passenger Information

13 May 00:01-01 September 00:00

service

  • Rail
Message last updated at 09:35 on 07/07/24:
 
From the 3rd July onwards the following cross-border trains services will be operated by non-Enterprise trains and will be operated by Irish Rail InterCity Railcar (ICR).
 
Full catering services will be available, with limited capacity in 1st Class and restricted space for bicycles (2 spaces instead of the usual 4).  
 
Monday - Saturday 
07:35 Dublin - Portadown
11:06 Portadown - Dublin 
13:20 Dublin - Portadown 
16:39 Portadown - Dublin 
19:00 Dublin - Portadown
20:48 Portadown - Dublin 
 
Sunday*
10:00 Dublin - Portadown 
13:36 Portadown - Dublin
16:00 Dublin -Portadown 
19:36 Portadown - Dublin 
 
*From the 3rd July onwards the following cross-border trains services will be operated by non-Enterprise trains and will be operated by a NI Railways CAF with no 1st Class facilities available on board.
 
Sunday 
09:40 Portadown - Dublin 
12:00 Dublin - Portadown
Posted

Having reviewed the timetables today I can confirm the following when Belfast Grand Central opens:

0602/0850/1202/1450/1756/2050 and 0800/1050/1402/1650/2002 are the Belfast diagrams.

Dublin roster will be 0650/1002/1250/1556/1850.

1 hour ago, jhb171achill said:

So everything else is DDs?

Yes

Posted
  1. Enterprise

Line Closure between Belfast Lanyon Place and Dublin Connolly Sat 3 to Mon 5 Aug (inc)

03 August 00:01-06 August 00:00

service

  • (Bus Sub) / 
  • Rail
Saturday 3 August to Monday 5 August - Temporary Line Closure between Belfast Lanyon Place and Dublin Connolly
 
Bus Substitution services will operate between:
• Belfast Lanyon Place to Dublin Connolly
• Newry and Portadown
Posted

I have managed to figure out the Enterprise diagrams from 25/08/2024

0602 Belfast / Connolly - 0850 Connolly / Belfast - 1202 Belfast/Connolly - 1450 Connolly/Belfast - 1756 Belfast/Connolly - 2050 Connolly / Belfast.


0800 Belfast / Connolly - 1050 Connolly / Belfast - 1402 Belfast/Connolly - 1650 Connolly/Belfast - 2002 Belfast/Connolly.


0650 Connolly/Belfast - 1002 Belfast / Connolly - 1250 Connolly / Belfast - 1556 Belfast / Connolly - 1850 Connolly / Belfast.

  • Thanks 1
  • Informative 1
  • 2 weeks later...
Posted
10 hours ago, IrishTrainScenes said:

@airfixfan so, 25/26 August for Grand Central?

I'm watching progress and updates pretty closely as I have 3 trips to Dublin from Belfast to make that week, and would rather not have to drive to Portadown each time and take the Enterprise from there--but will do in preference to taking the bus substitution!

Posted
27 minutes ago, Tractionman said:

Are we getting HSTs!?

Screenshot_20240730-230926.thumb.png.d3dbc9684d230e67a95448d8b5705459.png

Yes - once Dart+ starts, all trains from Rosslare and Belfast into Dublin will be HSTs; Highly Slow Trains.

28 minutes ago, Tractionman said:

Are we getting HSTs!?

Screenshot_20240730-230926.thumb.png.d3dbc9684d230e67a95448d8b5705459.png

What sort of lazy research is this......surely, whatever amateur clown designed this could at least put a picture of something that actually ran on this island; a Skibbereen tank engine missing a wheel would be more appropriate than an HST in a 1990s livery........

On 27/7/2024 at 7:11 AM, NIRCLASS80 said:

New Enterprise power!😂

20240708_092057713_iOS.jpeg

Complete with a logo of an organisation which ceased to trade in this fashion in 1996 - 28 years ago!

Bring back the flying snail...........

  • Funny 2
Posted
34 minutes ago, IrishTrainScenes said:

I am hearing unconfirmed reports that Grand Central won’t open until 22nd September?

the rolling initiation for hourly Enterprise services starts around the same time so it would make sense.

  • Informative 1
Posted
9 hours ago, IrishTrainScenes said:

I am hearing unconfirmed reports that Grand Central won’t open until 22nd September?

Looking yesterday at the Translink web-site there is a blank for Enterprise times after Aug 25, which is just a couple of weeks away! 

Join the conversation

You can post now and register later. If you have an account, sign in now to post with your account.

Guest
Reply to this topic...

×   Pasted as rich text.   Paste as plain text instead

  Only 75 emoji are allowed.

×   Your link has been automatically embedded.   Display as a link instead

×   Your previous content has been restored.   Clear editor

×   You cannot paste images directly. Upload or insert images from URL.

×
×
  • Create New...

Important Information

Terms of Use