Jump to content

Dempsey

Members
  • Posts

    489
  • Joined

  • Last visited

  • Days Won

    8

Everything posted by Dempsey

  1. Now the scenic work can continue with all the gremlins worked out electronically.
  2. They look fantastic. Can't wait for mine to arrive
  3. Trick is to get her to buy them for you
  4. No not at all, there is an esu decoder in it so unless the single tail light is programed for it I can't say.
  5. With the wiring fully completed a few issues have developed. 1. There is a dead section of track. This is on a point which was never intended to have a point motor as it is permanently set into the yard. While it had been pre wired I simple overlooked wiring it up. 2. The point motor at the far end of the yard has seized up, and won't throw. I've disconnected it and retested with a new 9v. Unfortunately it looks like I'll need a new one. On the other hand I did have some time to do some shunting. 20240128_190627.mp4
  6. I had a bid in to try and save it haha
  7. I know it gives a date that the amount is due, the pay now throw so thought better to check. Thanks for the reply Bos
  8. Do you have to go through partial.ly for putting down a deposit as it says you can do or is it a case that if you hit pay now it loads that option?
  9. Excellent
  10. Brilliant scenes
  11. Thank you, had a few gremlins at the start when I began but that was more down to learning. The ocd took over a bit with the routing of wiring but happy with the results. You are spot on on that front, glad to have it done and look forward to a bit of shunting around before working on some of the building lighting.
  12. Latest update at Barracks Street. The wiring as you can see if fully completed and tested. This includes the point motors and switches. There motors and switching harness was done with a 9v battery and pending the arrival of the power supply. I also built a control panel for the point switches. Your thoughts as always are appreciated. Chris
  13. While not going for a peacetime look the rusting and even the build up on the lower hull is not finished. The layers are still to be faded back. Thank you for the link, i will look into it.
  14. Airfix 1/600 HMS Hood model kit for a nice change of pace. Maybe I'm looking at this through the eyes of the 12 year old I was making the last kit I got from Airfix but I don't remember the being such issues with fitment as you can see. Here are some pictures of the progress so far. Your thoughts and comments are as always appreciated.
  15. Guilty as charged
  16. Absolutely, it really adds to the personal touch of a layout. Glad your enjoying the progress
  17. In the latest update I have spent the last while working on a number of scratch built cottages which face onto the road which will run the rear of the layout. The is still more details to add before painting. Also the view on the last picture, I plan to cut the backscene to allow viewing up along the street with the chance to see some train movements in the background toward the bridge. Your thoughts as always are appreciated. Chris.
  18. Thank you very much. If only I'd a sound chip for her.
  19. Turn of my NIR 201 to get the weathering treatment with the pending arrival of the NIR mk2's.
  20. Thank you very much. It is by far my favourite piece and scene of the layout
  21. Some more MK2 stock heavily weathered. Your thoughts as always appreciated
  22. IRrailways offer a weathering service for all coaching stock ranging from faint to heavy. To the customers own requirements. Below are a few examples. DM for enquiries and pricing.
      • 6
      • Like
  23. High praise, thank you
  24. Mk2 EGV got the weathering treatment. Your thoughts as always appreciated.
  25. Stolen at that price
×
×
  • Create New...

Important Information

Terms of Use