Jump to content

Ironroad

Members
  • Posts

    432
  • Joined

  • Last visited

Everything posted by Ironroad

  1. No he didn't and maybe taking a hit, https://www.ebay.com/itm/126296664917?mkevt=1&mkpid=0&emsid=e11021.m43.l3160&mkcid=7&ch=osgood&euid=b2696a00ff4541f49139a5316511df16&bu=43100402880&ut=RU&osub=-1~1&crd=20240124013200&segname=11021
  2. The clue to the running numbers is in the catalogue number, Paddy uses running numbers prefixed with MM as his catalogue numbers.
  3. From the |Murphy Models website, (obviously the shipping date has changed in the meantime) Class 141 Locomotives The Class 141/181 loco manufacturing process is complete, the locos are assembled, painted, packed, are due to ship before Chinese New Year (early Feb). DCC and DCC sound chips will be available at the same time. The main PCBs and light PCBs have been reengineered to accommodate the new factory installed speaker and facilitate the shunting light configuration of one white and one red light simultaneously. Arrival date is likely the beginning of Aprils.
  4. That's helpful, because if the ship is the COSCO NEBULA, there have been sightings. It left Xiamen on Dec 8. was seen in Yantian Dec 9-10, Singapore Dec 14, Felixstowe Jan 14-16, Zeebrugge Jan 17-18 and is currently en-route to Gdansk arriving tomorrow. So not so slow. But I would presume the container we are interested in has already been transferred to another ship or truck in either Felixstowe or Zeebrugge. So I'm guessing we don't have too much longer to wait. Forgive me for asking.
  5. Any sightings of that slow boat from China??
  6. It was me, but my issue was not with the concept of selling in multi packs but rather the combinations of coaches that made up these packs. The point I was making was that IRM was shooting itself in the foot and could have sold even more of these coaches had the the combinations in which they were being offered been more flexible. In my case I would have liked to be able to purchase prototypical rakes in both liveries, a total of fourteen coaches, but had to settle on one livery and nine coaches in order to put together a prototypical rake of seven coaches, leaving me with two redundant coaches. I could not justify buying eighteen coaches when all I wanted was fourteen. This point seems to have gone over Fran's head and his reaction was rather rude.
  7. Presumably the Hatton's allocation will trickle elsewhere across the distribution chain
  8. I need some clarification as to the descriptions provided on the IRM website; No. 5231 is described as a standard yet the picture appears to be a composite No. 5212 is described as a standard yet the picture appears to be a 1st No. 5203 is described as a standard yet the picture looks like a 1st Is it the case that the wrong pictures are posted and these should be pictures of the standard and the only composite is 5154 and the only 1st is 5103 Many Thanks
  9. Thank you, that makes sense (just 4 running numbers in all).
  10. Are there no limits to where the mind wanders, I thought the presentation box was wooden
  11. Hi Dave, harking back to this post from quite a while ago, these coaches were sold in shrink wrapped twin packs and just one running number is advertised on the exterior of each pack. So do you know the running numbers of the second coach in each pack? I have pack MM4101 and that contained coach no 4101 & 4108 with IR logos. But since there is a pack numbered 4108 with the IE logo, that would seem to indicate a repeat of the numbers in the different logos. I ask this in the context of the imminent release of the IRM MK2B & C coaches which are complimentary. Thank you Tom
  12. A word of caution if ordering MM MK2D coaches from Rails of Sheffield. The descriptions and the pictures on their website don't match properly, in some instances they are showing pictures of these coaches in Supertrain livery. It's a pity that MM did not update their website to ensure no confusion on what is being released.
  13. All very true, but some of the content of the announcement seems ominous, particularly the references to ageing demographic and no new blood. And they allude to a deterioration in the commercial environment. This on the heels of the Hattons closure. Even a giant like Hornby has had financial troubles and their behaviour and that of Bachmann has not been exemplary and speaks of fear. Let us just hope these things are no more than indicators of change and readjustment.
  14. This is tragic and sad news. An institution in the model trade and the very best retailer in the business with customer service second to none. I well remember visiting the shop on Smithdown Rd as far back as 1963 and eagerly reviewing their monthly listings received via the post (produced on a Gestetner duplicating machine) long before the internet, such was their vision. I'm shocked and will miss the convenience of shopping there. They were a one stop shop for a very wide and comprehensive range of mainstream products (with the best shipping rates) and that is something all of us should keep in mind when we choose to bypass a store like this and buy online directly from a manufacturer.
  15. Over a year ago Stephen indicated a J15 was not on the more immediate agenda, but didn't rule it out in the long term
  16. Maybe you could do that for 461 and just maybe it has sufficient commonality. I believe it operated on passenger and freight services widely across the network (south of the border) between 1923 and 1962, and again in preservation from 1990. Even those modelling realively recent times can justify it hauling models of RPSI stock.
  17. Patience is in order, we waited a long time for the 121 but we got them eventually. Paddy is indeed a one man operation and that probably contributes enormously to the viability of his business but being relatively small probably has an impact on his influence with the producers. He may announce something but may have little control if for example the production run is bumped. What do we know about this rerun, is it being commissioned from Bachmann as before or independently by MM?
  18. Thank you, that sounds very positive (and promising )
  19. Twelve months ago you said this;- " I can promise several things next year, including steam," You didn't keep that promise, that's what I mean by disappointment.
  20. Please no more promises with the ensuing disappointment. Tell us when you are actually doing something and stop alluding to what might be.
  21. Ironroad

    NEW 00 WORKS J15

    So just one day of 2023 left, I'm waiting with bated breath for the big announcement tomorrow.
  22. Lovely, but not a soul in sight?
  23. I cannot view (or hear) these videos either, nor will they download. I'm using a google notebook. After I click on the three vertical dots (to the right of the play bar), it goes through the motions of downloading and shows the video as a file in the download folder, but all I get when I open the file is a black screen. Something is incompatible.
  24. It seems so, "Ricardo" the bull recovering at animal sanctuary after ... CBS News https://www.cbsnews.com › ... › Local News
×
×
  • Create New...

Important Information

Terms of Use