-
Posts
2,898 -
Joined
-
Last visited
-
Days Won
144
Content Type
Profiles
Forums
Resource Library
Events
Gallery
Blogs
Store
Community Map
Everything posted by ttc0169
-
Wexford Model Railway Club - Easter Layout Exhibition - 17/18 April
ttc0169 replied to Noel's topic in What's On?
Looking forward to the exhibition -
IKEA Shelf Diorama - First Ever Railway Modelling Experience
ttc0169 replied to Rush and Lusk's topic in Irish Model Layouts
Well done George,you have many useful talents,look forward to more updates -
Great to see so many familiar faces in what was a fantastic day out… A selection of my photos from the day Photo 1-06:30 at Inchicore to prepare the train for service. Photo 2-081 at Drogheda Photo 3-returning from Dundalk just coming off the Boyne viaduct Photo 4-rounding the curve into Drogheda Photo 5-driver change at Heuston platform 10, Photo 6-Portarlington,waiting for the road West Photo 7- arrival in Galway Photo 8-arrival back at Connolly station.
-
mgwr preserved railway Connemara Railway project.
ttc0169 replied to ttc0169's topic in What's happening on the network?
The lever frame has been placed inside the signal cabin and roof felt have now been completed, Next up are the windows and slates.- 417 replies
-
- 11
-
-
-
And even a 4 piece 29000 railcar too
-
That was a shame as they were well built,and there was a market for the 2600s and the De Dietrich coaches. Maybe IRM might do something in a few years.
-
Yes DJ,looking at doing the same with my other 2600 railcar now. (2607+2608)
-
31-131 rests in the siding for the evening as her train is prepared by the 08 for dispatch tomorrow.
-
cie The Road freight section at Tara junction
ttc0169 replied to ttc0169's topic in Trucks, Vans and cars
An early 1990s scene being recreated here as we see an Irish rail ERF tractor unit with a tri axle bulk cement tanker commence operating from the cement silo area of the Lakeview freight yard as unloading of two axle bubble cement wagons has commenced. -
After encountering reliability issues with the original motor under Arrow railcar 2601+2602,I decided it was time to upgrade, A bargain purchase at Model rail Scotland of a Class 150 DMU enabled me to upgrade with ease,with the added bonus of interior lights and seating-(not possible on the original chassis) A built in speaker will allow me to transfer the original sound file onto the chip. Here are a few photos of the Arrow as she prepares to depart on an evening service to Kildare.
-
A CIE themed weekend on Tara junction, Cravens,Mk2ds and Mk3 are the passenger stock on show while two BELL liners and a two axle hopper train also make an appearance.
-
Brilliant scenes,well done
-
mgwr preserved railway Connemara Railway project.
ttc0169 replied to ttc0169's topic in What's happening on the network?
There is a great crew of volunteers at Maam cross -
-
007 passes through Tara junction hauling a two axle hopper train B to the worksite.
-
-
Thanks Jonathan,yes I am lucky my hands on experience has really helped me to recreate the real thing to miniature form on the layout
-
Removal of signal TJ25 by the S&E department was completed and the locomotive and wagon departed for the S&E compound.
-
Wexford Model Railway Club CLG Easter Exhibition 2022
ttc0169 replied to Irishrailwayman's topic in What's On?
Hotel is booked….ready for action- 19 replies
-
- 2
-
-
- model railway exhibition
- layout displays
-
(and 3 more)
Tagged with:
-
Same as that-I emailed them and a quick response was provided stating it was in the post.
-
mgwr preserved railway Connemara Railway project.
ttc0169 replied to ttc0169's topic in What's happening on the network?
More fantastic progress at Maam cross railway station…. A culvert was renewed and widened enabling the construction of the loop line over it, A new platform starting signal was erected and was put into working order, The signal cabin has had the new lever frame fitted,- 417 replies
-
- 21
-
-
-
cie The Road freight section at Tara junction
ttc0169 replied to ttc0169's topic in Trucks, Vans and cars