Jump to content

Darius43

Members
  • Posts

    1,059
  • Joined

  • Last visited

  • Days Won

    66

Everything posted by Darius43

  1. Hi Leslie. You mentioned the Milwaukee Road… Cheers Darius
  2. I was going to frame a reply using a reference to Methody, but thought better of it just in case there are some Methody alumni around… Cheers Darius
  3. Next project… Cheers Darius
  4. In action on the layout this morning Cheers Darius
  5. 6th and final coach completed Cheers Darius
  6. Latest progress. No prizes for spotting the part from a old felt-tipped pen… Cheers Darius
  7. Thanks guys - I have one more coach on the go to complete the 6-car unit. A pantograph coach. Cheers Darius
  8. The real thing. Now a thing of the past as the DC “Local” trains are now retired. Cheers Darius
  9. Five cars completed… …one more to go. Cheers Darius
  10. Running session in the shed last Saturday. Cheers Darius
  11. …and home made decals applied. Cheers Darius
  12. Painting completed. Cheers Darius
  13. Roof vent “Spangles” added and primer paint coat applied. Cheers Darius
  14. I have “lost” parts that I was going to glue only to find them stuck to my jumper later on… Cheers Darius
  15. Roof constructed using plasticard and the original Triang coach roof - with the molded on roof details removed. The edge of the roof base is superglued to a sheet of 0.5mm thick plasticard. Once this glued joint has cured, the roof is rolled round to the half way point and superglued in place, then rolled around again to glue the other side. After all the glued joints have cured the excess plasticard is trimmed away and the edges cleaned up. Cheers Darius
  16. Started work on a composite coach this evening. Sides marked out on a sheet of plasticard. Windows cut out. Doors cut out. Representations of the sliding doors and window shutters glued to the inside face of the carriage sides. These are always open. Coach ends made using a plasticard master template. Vestibule walls made from 1mm thick plasticard. These have the curved profile of the carriage sides on one edge and will be glued in place once the carriage sides have been fixed to the chassis. Carriage sides fixed in place. Cheers Darius
  17. Buffers and other details added to the cab end - plus bogies. Almost finished apart from the mesh grilles over the windows. Awaiting suitable mesh from the Bay of e. Cheers Darius
  18. Decals on. Cheers Darius
  19. Home made decals printed on clear and white decal paper. Cheers Darius
  20. Main painting completed. The roof is just placed loosely in the photos. The original Triang coach roof is sandwiched inside and the Triang roof bolts are used to hold it down in service. Cheers Darius
  21. Primer coat applied. Cheers Darius
  22. Roof vents and door grab posts added. Cheers Darius
  23. Roof on. Cheers Darius
  24. Cab end completed. Cheers Darius
  25. Driving coach bodyshell assembled - apart from the cab end. Cheers Darius
×
×
  • Create New...

Important Information

Terms of Use