Jump to content

warb

Members
  • Posts

    414
  • Joined

  • Last visited

  • Days Won

    91

Everything posted by warb

  1. thanks leslie I have a feeling it will only be cosmetic regards warb
  2. second line started
  3. some photos for comparison warb
  4. Works ongoing to barrow street. First time making overhead catenary made a total bags on first shot but getting there.
  5. Small update started messing around with overheads catenary on barrow street
  6. 1980's architecture at its best anything on an infill site
  7. Working on finishing on rostrevor court
  8. Last few buildings started rostrevor court on barrow street
  9. Completed at last roof to pearse station
  10. Final run in for the roof to pearse station on barrow street
  11. Slow progress recently made new railings for the layout
  12. One part of pearse station roof completed on barrow street
  13. Sods law when you start something you never have enough styrene strip to finish the glazing bars on the roof of the station on barrow street
  14. Updated photos of the roof on pearse station on barrow street with new glazing and roofing.Now for the long process of fitting approx 420 glazing bars to one side.
  15. Messin around with a new phone camera with barrow street warb
  16. David not far wrong! warb
  17. Hopefully but a good bit away,still to much to do. warb
  18. Transport box made for overall roof for pearse station on barrow street
  19. Started back working on barrow street and the overall roof for pearse station which the main roof is 6ft long and the making of transport boxes for same.The main roof is made of 1.5mm birch plywood.
  20. Some photos of signals in greystones prior to removal
  21. Some photos of signals in athy and a sad sight in tuam also a photo of jim bayle beside semaphore signals in enniscorthy whose first anniversary was the end of may and is sadly missed
  22. some photos of 4 wheel timber wagons warb
  23. Scale of the model is OO A few other photos of the construction and small router table to cut out parts which was also constructed warb
  24. A few years back I made a OO scale model of dun laoghaire town hall which i have attached a few photos.Overall it took a couple of years to make especially when you get fed up and walk away from it. regards warb
  25. refurb 131,122 and 134 and non refurb 122 regards warb
×
×
  • Create New...

Important Information

Terms of Use