I stumbled across a couple of interesting pics of the 1991 Foynes Phoenix railtour. The pics show that the above coaches formed a rake hauled by 170. The coaches were all air braked so compatible in that regard but what about the electrical systems? The pics show an NIR EGV at one end of the train and an IR rebuilt Dutch van EGV at the other end. Was the Dutch van there just to provide extra power to the whole rake because of its length or were the electrical systems incompatible, requiring two separate EGVs for each part of the train?
Question
murphaph
I stumbled across a couple of interesting pics of the 1991 Foynes Phoenix railtour. The pics show that the above coaches formed a rake hauled by 170. The coaches were all air braked so compatible in that regard but what about the electrical systems? The pics show an NIR EGV at one end of the train and an IR rebuilt Dutch van EGV at the other end. Was the Dutch van there just to provide extra power to the whole rake because of its length or were the electrical systems incompatible, requiring two separate EGVs for each part of the train?
https://images.app.goo.gl/Jrwkm7AsNBvDKSr49
9 answers to this question
Recommended Posts
Create an account or sign in to comment
You need to be a member in order to leave a comment
Create an account
Sign up for a new account in our community. It's easy!
Register a new accountSign in
Already have an account? Sign in here.
Sign In Now