Jump to content

ttc0169

Members
  • Posts

    2,993
  • Joined

  • Last visited

  • Days Won

    148

Everything posted by ttc0169

  1. That was a shame as they were well built,and there was a market for the 2600s and the De Dietrich coaches. Maybe IRM might do something in a few years.
  2. Yes DJ,looking at doing the same with my other 2600 railcar now. (2607+2608)
  3. 31-131 rests in the siding for the evening as her train is prepared by the 08 for dispatch tomorrow.
  4. Let’s recap on a fantastic five months of fun since these beauties were released into the modelling world I’ll let the pictures do the talking…. To the team at IRM….well done and THANK YOU
  5. An early 1990s scene being recreated here as we see an Irish rail ERF tractor unit with a tri axle bulk cement tanker commence operating from the cement silo area of the Lakeview freight yard as unloading of two axle bubble cement wagons has commenced.
  6. After encountering reliability issues with the original motor under Arrow railcar 2601+2602,I decided it was time to upgrade, A bargain purchase at Model rail Scotland of a Class 150 DMU enabled me to upgrade with ease,with the added bonus of interior lights and seating-(not possible on the original chassis) A built in speaker will allow me to transfer the original sound file onto the chip. Here are a few photos of the Arrow as she prepares to depart on an evening service to Kildare.
  7. A CIE themed weekend on Tara junction, Cravens,Mk2ds and Mk3 are the passenger stock on show while two BELL liners and a two axle hopper train also make an appearance.
  8. Brilliant scenes,well done
  9. There is a great crew of volunteers at Maam cross
  10. Excuse me but is this thread about the successful IRM A class locomotives ?
  11. The view from the turntable of 027 as the crew take a break.
  12. 007 passes through Tara junction hauling a two axle hopper train B to the worksite.
  13. A new addition to Ashburton grove-some 100 ton tanker wagons-seen here behind the 2x20s.
  14. Thanks Jonathan,yes I am lucky my hands on experience has really helped me to recreate the real thing to miniature form on the layout
  15. Removal of signal TJ25 by the S&E department was completed and the locomotive and wagon departed for the S&E compound.
  16. Same as that-I emailed them and a quick response was provided stating it was in the post.
  17. More fantastic progress at Maam cross railway station…. A culvert was renewed and widened enabling the construction of the loop line over it, A new platform starting signal was erected and was put into working order, The signal cabin has had the new lever frame fitted,
  18. The replacement of colour light signal TJ 25 has begun….
  19. It’s a busy morning at the Lakeview freight yard…
  20. 007 has charge of the two axle ballast hopper train as 027 works the HI-AB wagon to the work site.
  21. Soon to be joined by a new addition,we see the DMU working a Leeds-Doncaster local service.
  22. A great first day,meeting the usual suspects….and the lads at Accurascale/IRM….roll on day two
  23. A good choice lads,best of luck with the project.
  24. See you on Saturday Raymond
×
×
  • Create New...

Important Information

Terms of Use