Celtic_transport Posted Sunday at 17:14 Posted Sunday at 17:14 Hi all, curious to know if anyone has any info in regards to how gypsum trains were loaded at kingscourt over the years. I understand there was a rotating platform in the yard, which was then replaced by the large storage shed and digger in the 80s, just wondering was there another method before the rotating platform?
jhb171achill Posted Sunday at 22:32 Posted Sunday at 22:32 5 hours ago, Celtic_transport said: Hi all, curious to know if anyone has any info in regards to how gypsum trains were loaded at kingscourt over the years. I understand there was a rotating platform in the yard, which was then replaced by the large storage shed and digger in the 80s, just wondering was there another method before the rotating platform? Not sure, I could be mixing this up with something else, but was this where they used tractors to push stuff into wagons?
Celtic_transport Posted Sunday at 22:44 Author Posted Sunday at 22:44 7 minutes ago, jhb171achill said: Not sure, I could be mixing this up with something else, but was this where they used tractors to push stuff into wagons? This is the platform Im referring to, i believe gypsum started being transported by rail in 1939, Im unsure whether it would have been possible to load the trains this way with the road vehicles of the time. Im after stumbling across this image, of the gypsum site in its early years, and what looks like a railway wagon with "GS" on its side, I wonder if there was a siding into the site itself originally?? I know there was a siding into kingscourt brick factory before they built a loading platform along the line later, wonder if they done the same for the gypsum plant? 3 1
jhb171achill Posted Sunday at 23:11 Posted Sunday at 23:11 25 minutes ago, Celtic_transport said: This is the platform Im referring to, i believe gypsum started being transported by rail in 1939, Im unsure whether it would have been possible to load the trains this way with the road vehicles of the time. Im after stumbling across this image, of the gypsum site in its early years, and what looks like a railway wagon with "GS" on its side, I wonder if there was a siding into the site itself originally?? I know there was a siding into kingscourt brick factory before they built a loading platform along the line later, wonder if they done the same for the gypsum plant? I’ll ask Barry Carse when I see him. He probably has photos of it. 1
Mol_PMB Posted Monday at 06:20 Posted Monday at 06:20 You may have seen these already, there are some closer photos of the rotating platform and the ramp to it (which was alongside the loco shed), in the 1950s, 1960s and 1970s in the IRRS archive. It seems to have evolved a bit over time: PJF_MGWR_Kingscourt_01_Mar_1955 | [Photographer: Patrick J F… | Flickr GRM_MGWR_Kingscourt_25_June_1955 (2) | [Photographer: George… | Flickr NMA_GNR_177_Kingscourt_29_April_1961 | [Photographer: Norman… | Flickr GRM_MGWR_Kingscourt_03_June_1961 | [Photographer: George Mah… | Flickr VSP_SLNCR_2509_Kingscourt_03_July_1965 | [Photographer: Vinc… | Flickr NEG_CIE_26678_Kingscourt_17_April_1975 | [Photographer: Norm… | Flickr NEG_MGWR_Kingscourt_17_April_1975 | [Photographer: Norman Ga… | Flickr 1 1
Branchline121 Posted Monday at 09:21 Posted Monday at 09:21 Some photos do show the remains of what I assume to have been a siding into the factory. 2
Mayner Posted Monday at 09:28 Posted Monday at 09:28 5 hours ago, Celtic_transport said: Kingscourt The ramp and rotating table for loading gypsum traffic appears to have been installed at some stage during the 1950s The ramp and table were built in the space between an existing siding and the loco shed https://www.arcgis.com/apps/webappviewer/index.html?id=3ae19cc156bf4706a929304bf8fcc4f6 The loco and its train appear to be in the area once occupied by the loco shed/depot. The shed appears to have been demolished at some stage during the 1960s. https://www.flickr.com/photos/irishrailwayarchive/53507644047/in/album-72157661623942928, A photo of an IRRS steam special indicates that at one stage gypsum wagons were moved by rope and capstan shunting (P84 Lost Lines Ireland Nigel Welborne Ian Allen 2006). https://www.rmweb.co.uk/topic/191024-ropecapstan-shunting-in-4mmft/. A capstan and rope was located in the area of the left of the power pole/lamp in the 1980s photo and a rake of open wagons (mainly wooden bodied) was positioned in the run-round loop. I visited Kingscourt on an IRRS special (001 Class hauled!) in 1974/5. At the time gypsum for the Platin Cement factory was loaded in Bulleid corrugated opens, gypsum was being unloaded at Platin by crawler cranes with grab, the hopper unloading plant had not been comissioned. The old goods yard was full of Opens and a solitary ex-GN 6w Ballast Wagon, track was flatbottom dating from MGW days, no working signal interlocking points manually operated, facing point between running line and loop locked by clamp & padlock. Re-visited Kingscourt in 1982, still original FB track and ramp and table in use. Work had started on new loading area and storage shed, old goods yard area cleared and sidings removed. Not sure if there were any hopper wagons in the yard, operation likely to have been altered to out and back fixed formation to and from Drogheda/Platin following the ending of loose coupled working & capstan operation. Gypsum Industries Siding. Its possible that at one stage gypsum was mined/quarried in the immediate vicinity of the factory, in a similar manner to the way to the way cement, gypsum and brickworks are located close to the source of their principal raw material. The GNR (I) introduced six 20T Hopper Wagons (6015-6020) for gypsum traffic in 1944, with CIE introducing 3 20T Gypsum Hoppers 23963-6 in 1953! possibly for traffic from the Gypsum Industries Siding to the Boyne Road cement factory Drogheda. I remember reading about hopper wagons placed in the siding in a 1950s article of a journey over the line, possibly John O'Meara's "Meath Road" article/paper in a 1950s IRRS Journal. Another possibility is that the GNR may have routed gypsum from workings on the Cavan/Monaghan border on an all GNR routing via Carrickmacross and Dundalk to Boyne Road, rather than a CIE/GN routing through Kingscourt and Navan. Both routings involded a road transfer from mine/quarry to railhead and certain working closer to Carrick than Kingscourt. Personally I think its likely that the Gypsum Sidings may have sent out bagged plaster and possibly plasterboard in vans in a similar manner to bagged cement, until it became viable to ship by road direct from factory to the builders merchants permises. Changing colour of gypsum load. One of the noticeable features of the Kingscourt branch for many years was the the red gypsum carried by the trains and streak of red gypsum in the ballast (leakage through hopper doors) along the branch, in later years gypsum carried took ojn a dark grey hue, possibly a change to a different mine/quarry or being stored under cover before loading at Kingscourt. 2 1 3
Celtic_transport Posted Monday at 12:02 Author Posted Monday at 12:02 Thank you both for this information @Mayner @Branchline121, Im going to go after work to walk along the greenway at kingscourt, hopefully it will give me a better idea. 1
Celtic_transport Posted Monday at 20:12 Author Posted Monday at 20:12 Went on a nice stroll this evening from kingscourt station down to the gypsum plant. While its good to see the former trackbed put to use again albeit with feet instead of bogies, its a shame more of the yard and station building hasnt been restored to show what the site actually used to be. To a stranger you wouldnt know it was a station apart from the rails embedded in the tarmac. when i got to the gypsum factory there was an old overbridge above, i presume this originally carried the road, and then just on the suspected alignment of the siding, there was an old signal hidden in the trees. I wonder whether this was to protect the long lost siding? 1
Celtic_transport Posted Monday at 20:27 Author Posted Monday at 20:27 11 hours ago, Branchline121 said: Some photos do show the remains of what I assume to have been a siding into the factory. The signal that appears in this image is the one Im referring to, still present today. 1
skinner75 Posted yesterday at 09:01 Posted yesterday at 09:01 Wow - that is some change to the station since I saw it last - some 20 odd years ago when I was dating a girl from Kingscourt! Here's a vid we have probably all seen, of gypsum trains making their slow progress towards Kinscourt, what with having to stop for the many manually operated level crossings along the route: https://youtu.be/jxx5cij667o?si=eEa2sdo8rwopKLcq
jhb171achill Posted 23 hours ago Posted 23 hours ago (edited) 17 hours ago, Celtic_transport said: Went on a nice stroll this evening from kingscourt station down to the gypsum plant. While its good to see the former trackbed put to use again albeit with feet instead of bogies, its a shame more of the yard and station building hasnt been restored to show what the site actually used to be. To a stranger you wouldnt know it was a station apart from the rails embedded in the tarmac. when i got to the gypsum factory there was an old overbridge above, i presume this originally carried the road, and then just on the suspected alignment of the siding, there was an old signal hidden in the trees. I wonder whether this was to protect the long lost siding? I only travelled that line twice. The first time, maybe about 1975/6, it was raining lightly and quite cold when we got in. In the views you have there of the buildings on the platform, only the middle one is the station, the others being post-closure additions. The actual station house, if you look at it, with its red-brick structure too, and absence of awnings or large entrance doors from the platform, looks more like a domestic house; in fact, at the time it struck me as very like the 1862-built house I was brought up in. I was invited into the waiting room, just inside that “hall door” where an elderly lady was boiling the kettle. I don’t know who she was - she looked too old to be an employee and wasn’t wearing a CIE uniform. It was like being invited into a rural country kitchen. Time just seemed to stand still in there, with small talk among what looked like 2 or 3 locals, only one seemed to be a CIE person. It was an unusual but pleasant railway experience. Sitting in there on a bocketty old chair, mug of tea in hand, cosy warmth from an old AGA cooker (or some such thing), under a weak 60 watt single bulb in the middle of the ceiling, while the drizzle and wind outside made it their business to be hostile…. Edited 23 hours ago by jhb171achill 2
Celtic_transport Posted 23 hours ago Author Posted 23 hours ago 13 minutes ago, jhb171achill said: I only travelled that line twice. The first time, maybe about 1975/6, it was raining lightly and quite cold when we got in. In the views you have there of the buildings on the platform, only the middle one is the station, the others being post-closure additions. The actual station house, if you look at it, with its red-brick structure too, and absence of awnings or large entrance doors from the platform, looks more like a domestic house; in fact, at the time it struck me as very like the 1862-built house I was brought up in. I was invited into the waiting room, just inside that “hall door” where an elderly lady was boiling the kettle. I don’t know who she was - she looked too old to be an employee and wasn’t wearing a CIE uniform. It was like being invited into a rural country kitchen. Time just seemed to stand still in there, with small talk among what looked like 2 or 3 locals, only one seemed to be a CIE person. It was an unusual but pleasant railway experience. Sitting in there on a bocketty old chair, mug of tea in hand, cosy warmth from an old AGA cooker (or some such thing), under a weak 60 watt single bulb in the middle of the ceiling, while the drizzle and wind outside made it their business to be hostile…. Sounds like a wonderful experience to have, if only i was around back then to experience it myself. The new additions to the station building aren't even finished, in my opinion they should've left it as is, it looked much nicer. 1
jhb171achill Posted 23 hours ago Posted 23 hours ago 3 minutes ago, Celtic_transport said: Sounds like a wonderful experience to have, if only i was around back then to experience it myself. The new additions to the station building aren't even finished, in my opinion they should've left it as is, it looked much nicer. Totally agree!
Celtic_transport Posted 18 hours ago Author Posted 18 hours ago Today's location: Wilkinstown looks a lot more original than Kingscourt, has been well maintained and actually looks like a former railway station. would be a lovely location for someone to model who doesn't have the large space we all desire for a model railway. 4 2
Jonathan Allen Posted 17 hours ago Posted 17 hours ago 23 hours ago, Celtic_transport said: Went on a nice stroll this evening from kingscourt station down to the gypsum plant. While its good to see the former trackbed put to use again albeit with feet instead of bogies, its a shame more of the yard and station building hasnt been restored to show what the site actually used to be. To a stranger you wouldnt know it was a station apart from the rails embedded in the tarmac. when i got to the gypsum factory there was an old overbridge above, i presume this originally carried the road, and then just on the suspected alignment of the siding, there was an old signal hidden in the trees. I wonder whether this was to protect the long lost siding? Good to see the station building still stands: Kingscourt station | Opened by the Navan & Kingscourt Railwa… | Flickr with a few additions from my time. 2
Anders112 Posted 16 hours ago Posted 16 hours ago On 10/8/2026 at 10:28 AM, Mayner said: Changing colour of gypsum load. One of the noticeable features of the Kingscourt branch for many years was the the red gypsum carried by the trains and streak of red gypsum in the ballast (leakage through hopper doors) along the branch, in later years gypsum carried took ojn a dark grey hue, possibly a change to a different mine/quarry or being stored under cover before loading at Kingscourt. I was very fortunate to be part of a fieldtrip visit to the Gyproc mine for work. We had a great day out learning geology of gypsum. The big thing about the colour was the younger layers of the gypsum which are closer to the surface were the red colour while the grey was the older and deeper. You can see it in the photos below. The white gypsum samples we were show were more to be purer. I believe in recent weeks they have expanded the Mine over the far side of the R179. Still a shame to see it not go by rail. All goes by road now 3 1
Mayner Posted 9 hours ago Posted 9 hours ago Its possible that the gypsum railed from Kingscourt was originally sourced from an underground mine close to the station rather than the current Knockcranan open cast pit. When I visited the area in the late 90s a laneway lead from the R179 past the old loading ramp up the hill to what looked like an abandoned mine site . Although no mine buildings remained the OS Mapviewer satelite view indicates mining subsidence on the site. https://www.arcgis.com/apps/webappviewer/index.html?id=3ae19cc156bf4706a929304bf8fcc4f6 Its looks like gypsum may have been railed from an opencast pit in the Cormey (townland) just south of the Cavan/Monaghan border. https://www.arcgis.com/apps/webappviewer/index.html?id=3ae19cc156bf4706a929304bf8fcc4f6. This pit is/was accessed by a minor road/laneway east of the R179 approx-2-3 miles from the Kingscourt station workable for the 2 axle tippers in the photos of the ramp & turntable. Its possible Irish Cement sourced its gypsum from locally owned mines rather than gypsum Ireland. 1
Celtic_transport Posted 6 hours ago Author Posted 6 hours ago 2 hours ago, Mayner said: Its possible that the gypsum railed from Kingscourt was originally sourced from an underground mine close to the station rather than the current Knockcranan open cast pit. When I visited the area in the late 90s a laneway lead from the R179 past the old loading ramp up the hill to what looked like an abandoned mine site . Although no mine buildings remained the OS Mapviewer satelite view indicates mining subsidence on the site. https://www.arcgis.com/apps/webappviewer/index.html?id=3ae19cc156bf4706a929304bf8fcc4f6 Its looks like gypsum may have been railed from an opencast pit in the Cormey (townland) just south of the Cavan/Monaghan border. https://www.arcgis.com/apps/webappviewer/index.html?id=3ae19cc156bf4706a929304bf8fcc4f6. This pit is/was accessed by a minor road/laneway east of the R179 approx-2-3 miles from the Kingscourt station workable for the 2 axle tippers in the photos of the ramp & turntable. Its possible Irish Cement sourced its gypsum from locally owned mines rather than gypsum Ireland. @Mayner is this the open cast pit you're referring to?
Mayner Posted 1 hour ago Posted 1 hour ago The Cormey opencast pit is about half way between Kingscourt Station and the much larger Gyproc Knocranon mine. The Cormey pit appears to have been accessed by a laneway off the Kingscourt-Carrickmacross Rd. 1
Recommended Posts
Create an account or sign in to comment
You need to be a member in order to leave a comment
Create an account
Sign up for a new account in our community. It's easy!
Register a new accountSign in
Already have an account? Sign in here.
Sign In Now